Layer23 Switch Logo
Layer23-Switch.com

Arista 802.11ac Wave 2 AP-O105E EOL Dates

Part Number: AP-O105E Model Number: AP-O105E
EoS – Sales Ended

EOSL Date: 2027-12-31

AP-O105E Lifecycle Timeline


  • End-of-Life Announcement (EOL)
    2022-01-17


  • End of Sale (EOS)
    2022-06-30


  • End of Service Life (EOSL)
    2027-12-31

AP-O235E
NEW

AP-O105E has reached EOL / EOS. Suggested replacement: O-235E 4x4+2x2 tri radio 802.11ax (Wi-Fi 6) outdoor access point with IP67 enclosure, industrial operating temperature and external antenna connectors. Antennas not included for continued Cisco support.

Official Arista EOL notice

You can view the official Arista EOL / EOSL bulletin for this product at the link below.

View Official EOL Documentation

AP-O105E EOL Data – Full Overview

End-of-Life Announcement (EOL)
2022-01-17
End of Sale (EOS)
2022-06-30
End of Service Life (EOSL)
2027-12-31

Request a Quote

Leave your contact information and requirement details. Our sales team will reply as soon as possible.

How would you like us to contact you?

Lifecycle summary · Arista AP-O105E

Arista AP-O105E End-of-Life (EOL) & End-of-Sale (EOS) Overview

This page provides the official End-of-Sale (EOS), End-of-Life (EOL) and End of Service Life (EOSL) milestones for Arista AP-O105E. Use these lifecycle dates to plan hardware replacement, upgrade projects, and migration to newer Arista platforms before the product is fully discontinued.

By understanding the Arista AP-O105E EOL / EOSL timeline and support policy, IT managers, resellers and network integrators can renew maintenance contracts on time, reduce unplanned downtime, and choose compatible replacement models that fit their long-term network roadmap.

  • Plan EOS / EOL hardware refresh
  • Align support contracts with EOSL dates
  • Evaluate Arista replacement & upgrade options