Manufacturer lifecycle list

H3C EOL & EOSL List

Browse H3C End-of-Life, End-of-Sale, and End-of-Service-Life records. Search a part number directly, or open a product series to compare lifecycle dates across related models.

269 products 67 series

H3C End-of-Life Product List

Total Products: 269 | Page 13 of 14

Use this table to check H3C lifecycle milestones by exact part number. Open a model page for source links, replacement fields, and quote options.

9801A24H

H3C WA6622 Internal Antennas 6 Streams Dual Radio 802.11ax/ac/n Access Point,FIT

EOL
2025-08-01
EOS
2026-01-26
EOSL
2031-01-26
9801A27K

H3C SecPath F1000-AI-10 Firewall Appliance with 18*GE Copper,2*SFP Plus,4*Bypass,8*Combo,2*Management Port,2*USB,and 1*Console

EOL
2024-12-19
EOS
2025-06-30
EOSL
2030-06-30
9801A295

H3C WA538 Internal Antennas 8 Streams Triple Radio 802.11ac/n Wave 2 Access Point,FIT,JP

EOL
2022-12-09
EOS
2023-03-31
EOSL
2028-03-31
9801A297

H3C WA6320H Internal Antennas 4 Streams Dual Radio 802.11ax/ac/n Walljack Access Point,FIT

EOL
2025-05-14
EOS
2024-09-30
EOSL
2029-09-30
9801A2BR

H3C WA530 Internal Antennas 4 Streams Dual Radio 802.11ac/n Wave 2 Access Point,WW

EOL
2022-12-09
EOS
2023-03-31
EOSL
2028-03-31
9801A2TH

H3C S5560S-52F-EI L3 Ethernet Switch with 48*100/1000 BASE-X SFP Ports, 2*GE Combo Ports, and 4*1G/10G BASE-X SFP Plus Ports

EOL
2022-12-30
EOS
2023-06-30
EOSL
2028-06-30
9801A2TJ

H3C S5560S-52S-PWR-EI L3 Ethernet Switch with 48*10/100/1000BASE-T PoE+ Ports and 4*1G/10GBASE-X SFP Plus Ports

EOL
2022-12-30
EOS
2023-06-30
EOSL
2028-06-30
9801A2TM

H3C S5560S-28S-PWR-EI L3 Ethernet Switch with 24*10/100/1000BASE-T PoE+ Ports (Including 4*SFP Combo Ports) and 4*1G/10GBASE-X SFP Plus Ports

EOL
2022-12-30
EOS
2023-06-30
EOSL
2028-06-30
9801A3F8

H3C S5560S-28F-EI L3 Ethernet Switch with 24*100/1000BASE-X SFP Ports (Including 8*GE Combo Ports) and 4*1G/10G BASE-X SFP Plus Ports,Without Power Supplies

EOL
2022-12-30
EOS
2023-06-30
EOSL
2028-06-30
9801A3KR

H3C ICG2000D-EI Information Communication Gateway

EOL
2024-12-19
EOS
2025-03-31
EOSL
2030-03-31
LS-6800-32Q-H1

H3C S6800-32Q L3 Ethernet Switch with 32 QSFP+ Ports

EOL
2025-06-11
EOS
2025-12-15
EOSL
2030-12-15
LSWM116FC

H3C S6800 16 Ports SFP28 Ethernet Optical Interface Module with 16G/32G FC

EOL
2025-06-11
EOS
2025-12-15
EOSL
2030-12-15
LSWM124XG2QFC

H3C 24 Ports SFP Plus and 2 Ports QSFP Plus Interface Card with FC

EOL
2025-06-11
EOS
2025-12-15
EOSL
2030-12-15
LSWM12H2Q

H3C S6800 2-Port QSFP28 and 2-Port QSFP Plus Ethernet Optical Interface Module

EOL
2025-06-11
EOS
2025-12-15
EOSL
2030-12-15
S5130S-28P-EI

H3C S5130S-28P-EI Switch(24*10/100/1000BASE-T PoE+ ports, 4*100/1000BASE-X SFP ports)

EOL
2024-09-30
EOS
2025-03-31
EOSL
2030-03-31
S5130S-28S-EI

H3C S5130S-28S-EI Switch(24*10/100/1000BASE-T ports, 4*100/1000BASE-X SFP ports)

EOL
2024-09-30
EOS
2025-03-31
EOSL
2030-03-31
S5130S-52P-EI

H3C S5130S-52P-EI Switch(48*10/100/1000BASE-T PoE+ ports, 4*100/1000BASE-X SFP ports)

EOL
2024-09-30
EOS
2025-03-31
EOSL
2030-03-31
S5130S-52S-EI

H3C S5130S-52S-EI Switch(48*10/100/1000BASE-T ports, 4*100/1000BASE-X SFP ports)

EOL
2024-09-30
EOS
2025-03-31
EOSL
2030-03-31
SMB-S1205-EU-GL

H3C S1205 Ethernet Switch(5GE,DC),European Standard

EOL
2021-08-16
EOS
2022-01-31
EOSL
2027-01-30
SMB-S1205-PWR-GL

H3C S1205-PWR Ethernet Switch(5GE+PoE(32W),DC)

EOL
2021-08-16
EOS
2022-01-31
EOSL
2027-01-30
1 11 12 14

H3C Product Series EOL List

Select a product series to view the full model table with EOL, EOS, and EOSL dates.

Lifecycle policy overview

H3C End-of-Life Policy Overview

H3C lifecycle planning typically centers on switches, routers, WLAN, security, and data-center platforms. Model-level records are useful because regional availability and support windows can vary across closely named products.

1

Notice

The affected H3C family or SKU is identified.

2

Sale End

Standard purchasing or configuration availability ends.

3

Maintenance

Software maintenance and support services may narrow before final support.

4

Support End

The final support date is the deadline for refresh or risk acceptance.