Cisco Emulex LPe 11002 Dual Port 4Gb Fibre Channel HBA
- EOL
- 2015-03-11
- EOS
- 2015-09-09
- EOSL
- 2020-09-30
Browse Cisco End-of-Life, End-of-Sale, and End-of-Service-Life records. Search a part number directly, or open a product series to compare lifecycle dates across related models.
Total Products: 32759 | Page 1021 of 1638
Use this table to check Cisco lifecycle milestones by exact part number. Open a model page for source links, replacement fields, and quote options.
Cisco Emulex LPe 11002 Dual Port 4Gb Fibre Channel HBA
Cisco Emulex LPe 12002, 8Gb dual port Fibre Channel HBA
Cisco Intel Quad port GbE Controller (E1G44ETG1P20)
Cisco Mellanox ConnectX-2 EN with dual 10GbE SFP+ ports
Cisco Qlogic QLE 8152-CNA 2port 10Gb SFP+ Copper
Cisco Qlogic QLE2462 Dual Port 4Gb Fibre Channel HBA
Cisco Qlogic QLE2562 Dual Port 8Gb Fibre Channel HBA
Cisco Nexus 3550-F Modular Layer 1 Matrix Switch
Cisco Nexus 3550-F accessory kit
Cisco Nexus 3550-F fan module, port-side exhaust
Cisco Nexus 3550-F fan module, port-side intake
Cisco Nexus 3550-F FPGA Module
Cisco Nexus 3550-F KU115 FPGA internal module
Cisco Nexus 3550-F Fusion HPT FPGA internal module
Cisco Nexus 3550-F AC power supply, port-side exhaust
Cisco Nexus 3550-F AC power supply, port-side exhaust
Cisco Nexus 3550-F AC power supply, port-side intake
Cisco Nexus 3550-F AC power supply, port-side intake
Cisco Nexus 3550-F DC power supply, port-side exhaust
Cisco Nexus 3550-F DC power supply, port-side intake
| Part Number | Product Name | EOL Announcement | End of Sale (EOS) | End of Service Life (EOSL) |
|---|---|---|---|---|
| N2XX-AEPCI03 | Cisco Emulex LPe 11002 Dual Port 4Gb Fibre Channel HBA | 2015-03-11 | 2015-09-09 | 2020-09-30 |
| N2XX-AEPCI05 | Cisco Emulex LPe 12002, 8Gb dual port Fibre Channel HBA | 2019-02-14 | 2020-02-14 | 2025-02-28 |
| N2XX-AIPCI02 | Cisco Intel Quad port GbE Controller (E1G44ETG1P20) | 2012-12-07 | 2013-03-08 | 2018-03-31 |
| N2XX-AMPCI01 | Cisco Mellanox ConnectX-2 EN with dual 10GbE SFP+ ports | 2012-12-07 | 2013-03-08 | 2018-03-31 |
| N2XX-AQPCI01 | Cisco Qlogic QLE 8152-CNA 2port 10Gb SFP+ Copper | 2012-12-07 | 2013-03-08 | 2018-03-31 |
| N2XX-AQPCI03 | Cisco Qlogic QLE2462 Dual Port 4Gb Fibre Channel HBA | 2015-03-11 | 2015-09-09 | 2020-09-30 |
| N2XX-AQPCI05 | Cisco Qlogic QLE2562 Dual Port 8Gb Fibre Channel HBA | 2019-02-14 | 2020-02-14 | 2025-02-28 |
| N35-F-48X | Cisco Nexus 3550-F Modular Layer 1 Matrix Switch | 2022-10-10 | 2023-04-10 | 2028-04-30 |
| N35-F-ACK | Cisco Nexus 3550-F accessory kit | 2022-10-10 | 2023-04-10 | 2028-04-30 |
| N35-F-FAN-PE | Cisco Nexus 3550-F fan module, port-side exhaust | 2022-10-10 | 2023-04-10 | 2028-04-30 |
| N35-F-FAN-PI | Cisco Nexus 3550-F fan module, port-side intake | 2022-10-10 | 2023-04-10 | 2028-04-30 |
| N35-F-KU115 | Cisco Nexus 3550-F FPGA Module | 2022-10-10 | 2023-04-10 | 2028-04-30 |
| N35-F-KU115-OPT | Cisco Nexus 3550-F KU115 FPGA internal module | 2022-10-10 | 2023-04-10 | 2028-04-30 |
| N35-F-KUHPT | Cisco Nexus 3550-F Fusion HPT FPGA internal module | 2022-10-10 | 2023-04-10 | 2028-04-30 |
| N35-F-PAC-PE | Cisco Nexus 3550-F AC power supply, port-side exhaust | 2022-10-10 | 2023-04-10 | 2028-04-30 |
| N35-F-PAC-PE2 | Cisco Nexus 3550-F AC power supply, port-side exhaust | 2022-10-10 | 2023-04-10 | 2028-04-30 |
| N35-F-PAC-PI | Cisco Nexus 3550-F AC power supply, port-side intake | 2022-10-10 | 2023-04-10 | 2028-04-30 |
| N35-F-PAC-PI2 | Cisco Nexus 3550-F AC power supply, port-side intake | 2022-10-10 | 2023-04-10 | 2028-04-30 |
| N35-F-PDC-PE | Cisco Nexus 3550-F DC power supply, port-side exhaust | 2022-10-10 | 2023-04-10 | 2028-04-30 |
| N35-F-PDC-PI | Cisco Nexus 3550-F DC power supply, port-side intake | 2022-10-10 | 2023-04-10 | 2028-04-30 |
Select a product series to view the full model table with EOL, EOS, and EOSL dates.
No matching series found.
Cisco EOL notices normally break a product retirement into several planning dates, from the public announcement through the final support milestone. Use this page to confirm the exact part number before making refresh, support-renewal, or spare-unit decisions.
Cisco publishes the retirement notice and the affected product IDs.
The normal order window closes for the listed product or license.
Maintenance, new service attachment, and renewal dates can close before final support.
The last support date is the practical EOSL milestone for most planning work.