Cisco Refurbished SCE8000 DC Power Supply
- EOL
- 2018-11-01
- EOS
- 2019-04-30
- EOSL
- 2024-04-30
Browse Cisco End-of-Life, End-of-Sale, and End-of-Service-Life records. Search a part number directly, or open a product series to compare lifecycle dates across related models.
Total Products: 32665 | Page 1251 of 1634
Use this table to check Cisco lifecycle milestones by exact part number. Open a model page for source links, replacement fields, and quote options.
Cisco Refurbished SCE8000 DC Power Supply
Cisco SCE8000 SPA Interface Processor for 2-port GE SPA
Cisco SCE 8000 Service Control Module - Enhanced
Cisco Refurbished SCE 8000 Service Control Module - Enhanced
Cisco SCE 8000 SPA Interface Processor
Cisco SCE8000 SPA Interface Processor for 2x10GE SPA
Cisco Refurbished SCE 8000 SPA Interface Processor
Cisco SCE8000 SPA Interface Processor Upgrade
Cisco S+C Metal 10in In-Wall Back Box, 1 SM/1 LRG Tab, NC
Cisco S+C Metal 10in In-Wall Back Box w/ 2 Large Tabs, NC
Cisco S+C Metal 10in In-Wall Back Box w/ 2 Small Tabs, NC
Cisco S+C Metal 10in In-Wall Back Box w/ Concrete Tabs, NC
Cisco S+C 10in Touch Screen-White
Cisco S+C 7in Touch Screen-Black
Cisco S+C 7in Touch Screen-White
Cisco S+C Controller 250
Cisco S+C Controller 800
Cisco S+C Controller 800 Power Supply
Cisco S+C Hospitality Suite Room Remote Control
Cisco S+C IO Extender
| Part Number | Product Name | EOL Announcement | End of Sale (EOS) | End of Service Life (EOSL) |
|---|---|---|---|---|
| SCE8000-PS-DC-RF | Cisco Refurbished SCE8000 DC Power Supply | 2018-11-01 | 2019-04-30 | 2024-04-30 |
| SCE8000-S-GIGE-2 | Cisco SCE8000 SPA Interface Processor for 2-port GE SPA | 2012-09-01 | 2013-03-02 | 2018-02-28 |
| SCE8000-SCM-E | Cisco SCE 8000 Service Control Module - Enhanced | 2018-11-01 | 2019-04-30 | 2024-04-30 |
| SCE8000-SCM-E-RF | Cisco Refurbished SCE 8000 Service Control Module - Enhanced | 2018-11-01 | 2019-04-30 | 2024-04-30 |
| SCE8000-SIP | Cisco SCE 8000 SPA Interface Processor | 2018-11-01 | 2019-04-30 | 2024-04-30 |
| SCE8000-SIP-201 | Cisco SCE8000 SPA Interface Processor for 2x10GE SPA | 2012-09-01 | 2013-03-02 | 2018-02-28 |
| SCE8000-SIP-RF | Cisco Refurbished SCE 8000 SPA Interface Processor | 2018-11-01 | 2019-04-30 | 2024-04-30 |
| SCE8000-SIP-UPG | Cisco SCE8000 SPA Interface Processor Upgrade | 2018-11-01 | 2019-04-30 | 2024-04-30 |
| SCH-10IN-NBB-1S1L | Cisco S+C Metal 10in In-Wall Back Box, 1 SM/1 LRG Tab, NC | 2014-05-30 | 2014-11-28 | 2019-11-30 |
| SCH-10IN-NEWBB-2L | Cisco S+C Metal 10in In-Wall Back Box w/ 2 Large Tabs, NC | 2014-05-30 | 2014-11-28 | 2019-11-30 |
| SCH-10IN-NEWBB-2S | Cisco S+C Metal 10in In-Wall Back Box w/ 2 Small Tabs, NC | 2014-05-30 | 2014-11-28 | 2019-11-30 |
| SCH-10IN-NEWBB-CT | Cisco S+C Metal 10in In-Wall Back Box w/ Concrete Tabs, NC | 2014-05-30 | 2014-11-28 | 2019-11-30 |
| SCH-10IN-TS-W | Cisco S+C 10in Touch Screen-White | 2014-05-30 | 2014-11-28 | 2019-11-30 |
| SCH-7IN-TS-B | Cisco S+C 7in Touch Screen-Black | 2014-05-30 | 2014-11-28 | 2019-11-30 |
| SCH-7IN-TS-W | Cisco S+C 7in Touch Screen-White | 2014-05-30 | 2014-11-28 | 2019-11-30 |
| SCH-CONTROL-250 | Cisco S+C Controller 250 | 2014-05-30 | 2014-11-28 | 2019-11-30 |
| SCH-CONTROL-800 | Cisco S+C Controller 800 | 2014-05-30 | 2014-11-28 | 2019-11-30 |
| SCH-CONTROL800-PS | Cisco S+C Controller 800 Power Supply | 2014-05-30 | 2014-11-28 | 2019-11-30 |
| SCH-HOSREM-150 | Cisco S+C Hospitality Suite Room Remote Control | 2014-05-30 | 2014-11-28 | 2019-11-30 |
| SCH-IO-EXT-8 | Cisco S+C IO Extender | 2014-05-30 | 2014-11-28 | 2019-11-30 |
Select a product series to view the full model table with EOL, EOS, and EOSL dates.
No matching series found.
Cisco EOL notices normally break a product retirement into several planning dates, from the public announcement through the final support milestone. Use this page to confirm the exact part number before making refresh, support-renewal, or spare-unit decisions.
Cisco publishes the retirement notice and the affected product IDs.
The normal order window closes for the listed product or license.
Maintenance, new service attachment, and renewal dates can close before final support.
The last support date is the practical EOSL milestone for most planning work.