Cisco SF300-48 48-port 10/100 Managed Switch with Gigabit Uplinks
- EOL
- 2017-08-02
- EOS
- 2018-08-02
- EOSL
- 2023-08-31
Browse Cisco End-of-Life, End-of-Sale, and End-of-Service-Life records. Search a part number directly, or open a product series to compare lifecycle dates across related models.
Total Products: 32665 | Page 1357 of 1634
Use this table to check Cisco lifecycle milestones by exact part number. Open a model page for source links, replacement fields, and quote options.
Cisco SF300-48 48-port 10/100 Managed Switch with Gigabit Uplinks
Cisco SF 300-48 48-port 10/100 Managed Switch with Gigabit Uplinks
Cisco SF 300-48 48-port 10/100 Managed Switch with Gigabit Uplinks
Cisco SG300-52P 52-port Gigabit PoE Managed Switch
S+C EXEC EXPERIENCE BASE LIC FOR 1 CONF ROOM & 1 EXEC OFFICE
Cisco WSG R2.0 Application Software RTU per SAMI (Crypto)
Cisco WSG R3.0 Application Software RTU per SAMI (Crypto) Spare
Cisco WSG R4.0 Application Software RTU per SAMI (Crypto)
Cisco 400GB SSD drive for WAVE 594
Cisco Catalyst 8000 Edge SSD M.2 NVMe 2TB
Cisco Catalyst 8000 Edge SSD M.2 NVMe 600GB spare
Cisco 200 GB, SATA Solid State Disk
Cisco 800 GB, SATA Solid State Disk
Cisco 800GB SSD drive for WAVE Applaince
Cisco MDS SSI Image 5.0(4)
Cisco SP AR HW 24X7X2 SV= D9900 DCM,2RU,2/AC,GbE,Co-Pro,ASI
Cisco MDS SSI Image 5.2(1A)
Cisco MDS SSI Image 5.2(2)
Cisco MDS SSI Image 5.2(6)
Cisco MDS SSI Image 5.2(8)
| Part Number | Product Name | EOL Announcement | End of Sale (EOS) | End of Service Life (EOSL) |
|---|---|---|---|---|
| SRW248G4-K9-EU | Cisco SF300-48 48-port 10/100 Managed Switch with Gigabit Uplinks | 2017-08-02 | 2018-08-02 | 2023-08-31 |
| SRW248G4-K9-NA | Cisco SF 300-48 48-port 10/100 Managed Switch with Gigabit Uplinks | 2017-08-02 | 2018-08-02 | 2023-08-31 |
| SRW248G4-K9-UK | Cisco SF 300-48 48-port 10/100 Managed Switch with Gigabit Uplinks | 2017-08-02 | 2018-08-02 | 2023-08-31 |
| SRW248G4P-K9 | Cisco SG300-52P 52-port Gigabit PoE Managed Switch | 2018-05-15 | 2018-11-15 | 2023-11-30 |
| SS-EX-K9-1 | S+C EXEC EXPERIENCE BASE LIC FOR 1 CONF ROOM & 1 EXEC OFFICE | 2017-06-16 | 2017-09-15 | 2017-09-15 |
| SSAS20K9-COSLI20 | Cisco WSG R2.0 Application Software RTU per SAMI (Crypto) | 2015-12-11 | 2016-06-10 | 2021-06-30 |
| SSAS30K9-COSLI30 | Cisco WSG R3.0 Application Software RTU per SAMI (Crypto) Spare | 2015-12-11 | 2016-06-10 | 2021-06-30 |
| SSAS40K9-COSLI30 | Cisco WSG R4.0 Application Software RTU per SAMI (Crypto) | 2015-12-11 | 2016-06-10 | 2021-06-30 |
| SSD-594-400GB | Cisco 400GB SSD drive for WAVE 594 | 2017-09-30 | 2018-03-31 | 2023-03-31 |
| SSD-M2NVME-2T | Cisco Catalyst 8000 Edge SSD M.2 NVMe 2TB | 2023-12-19 | 2024-03-19 | 2029-03-31 |
| SSD-M2NVME-600G | Cisco Catalyst 8000 Edge SSD M.2 NVMe 600GB spare | 2023-12-19 | 2024-03-19 | 2029-03-31 |
| SSD-SATA-200G | Cisco 200 GB, SATA Solid State Disk | 2017-03-29 | 2017-09-27 | 2022-09-30 |
| SSD-SATA-800G | Cisco 800 GB, SATA Solid State Disk | 2019-04-30 | 2019-10-29 | 2024-10-31 |
| SSD-WAVE-800GB | Cisco 800GB SSD drive for WAVE Applaince | 2017-09-30 | 2018-03-31 | 2023-03-31 |
| SSI-M9K9-504 | Cisco MDS SSI Image 5.0(4) | 2015-05-15 | 2015-11-13 | 2020-11-30 |
| SSI-M9K9-521 | Cisco SP AR HW 24X7X2 SV= D9900 DCM,2RU,2/AC,GbE,Co-Pro,ASI | 2015-05-15 | 2015-11-13 | 2020-11-30 |
| SSI-M9K9-521A | Cisco MDS SSI Image 5.2(1A) | 2015-05-15 | 2015-11-13 | 2020-11-30 |
| SSI-M9K9-522 | Cisco MDS SSI Image 5.2(2) | 2015-05-15 | 2015-11-13 | 2020-11-30 |
| SSI-M9K9-526 | Cisco MDS SSI Image 5.2(6) | 2015-05-15 | 2015-11-13 | 2020-11-30 |
| SSI-M9K9-528 | Cisco MDS SSI Image 5.2(8) | 2015-05-15 | 2015-11-13 | 2020-11-30 |
Select a product series to view the full model table with EOL, EOS, and EOSL dates.
No matching series found.
Cisco EOL notices normally break a product retirement into several planning dates, from the public announcement through the final support milestone. Use this page to confirm the exact part number before making refresh, support-renewal, or spare-unit decisions.
Cisco publishes the retirement notice and the affected product IDs.
The normal order window closes for the listed product or license.
Maintenance, new service attachment, and renewal dates can close before final support.
The last support date is the practical EOSL milestone for most planning work.