Cisco UCS S3260 8TB NL-SAS 7.2K UE10 HDD rear with HDD Carrier
- EOL
- 2020-03-13
- EOS
- 2020-06-12
- EOSL
- 2020-06-12
Browse Cisco End-of-Life, End-of-Sale, and End-of-Service-Life records. Search a part number directly, or open a product series to compare lifecycle dates across related models.
Total Products: 32333 | Page 1444 of 1617
Use this table to check Cisco lifecycle milestones by exact part number. Open a model page for source links, replacement fields, and quote options.
Cisco UCS S3260 8TB NL-SAS 7.2K UE10 HDD rear with HDD Carrier
VOID; Not Used
Cisco Void; Not Used
Cisco UCS S3260 8TB NL-SAS 7.2K UE10 HDD with HDD Carrier
Cisco UCS S3260 M5 Svr Node w/IOE Configurable
Cisco UCS S3260 M5 Server Node for Intel Scalable CPUs
Cisco UCS S3260 M5 Svr Node w/o CPU, memory
Cisco UCS S3260 M5/SIOC 1TB NVMe (no Sled)
Cisco UCS S3260 M5/SIOC 2TB NVMe (no Sled)
Cisco UCS S3260 M5/SIOC 500G NVMe (no Sled)
Cisco UCS S3260 1.6TB NVMe SSD for M5 Node(SN 200)
Cisco UCS S3260 3.2TB NVMe SSD for M5 Node(SN 200)
Cisco UCS S3260 6.4TB NVMe SSD for M5 Node(SN 200)
Cisco UCS S3260 800G NVMe SSD for M5 Node(SN 200)
Cisco VOID
Cisco UCS S3260 400G SED Top Load K9
Cisco UCS S3260 800G SED Top Load K9
Cisco UCS S3348 Pass through Controller (IT) based on LSI
Cisco UCS S3348 Raid Controller based on LSI
Cisco UCS S3X48 Chassis Fan
| Part Number | Product Name | EOL Announcement | End of Sale (EOS) | End of Service Life (EOSL) |
|---|---|---|---|---|
| UCS-S3260-8TBRR | Cisco UCS S3260 8TB NL-SAS 7.2K UE10 HDD rear with HDD Carrier | 2020-03-13 | 2020-06-12 | 2020-06-12 |
| UCS-S3260-EX32T | VOID; Not Used | 2020-05-22 | 2020-08-21 | 2020-11-19 |
| UCS-S3260-EX8T | Cisco Void; Not Used | 2021-04-12 | 2021-10-10 | 2022-01-09 |
| UCS-S3260-HD8TB | Cisco UCS S3260 8TB NL-SAS 7.2K UE10 HDD with HDD Carrier | 2020-03-13 | 2020-06-12 | 2020-06-12 |
| UCS-S3260-M5SBI-U | Cisco UCS S3260 M5 Svr Node w/IOE Configurable | 2024-08-05 | 2025-02-03 | 2030-02-28 |
| UCS-S3260-M5SRB | Cisco UCS S3260 M5 Server Node for Intel Scalable CPUs | 2024-08-05 | 2025-02-03 | 2030-02-28 |
| UCS-S3260-M5SRB-U | Cisco UCS S3260 M5 Svr Node w/o CPU, memory | 2024-08-05 | 2025-02-03 | 2030-02-28 |
| UCS-S3260-NVG210 | Cisco UCS S3260 M5/SIOC 1TB NVMe (no Sled) | 2021-04-20 | 2021-05-20 | 2021-08-20 |
| UCS-S3260-NVG220 | Cisco UCS S3260 M5/SIOC 2TB NVMe (no Sled) | 2021-04-20 | 2021-05-20 | 2021-08-20 |
| UCS-S3260-NVG25 | Cisco UCS S3260 M5/SIOC 500G NVMe (no Sled) | 2019-06-14 | 2019-09-13 | 2019-09-13 |
| UCS-S3260-NVM416 | Cisco UCS S3260 1.6TB NVMe SSD for M5 Node(SN 200) | 2021-05-07 | 2021-08-06 | 2021-08-06 |
| UCS-S3260-NVM432 | Cisco UCS S3260 3.2TB NVMe SSD for M5 Node(SN 200) | 2021-05-07 | 2021-08-06 | 2021-08-06 |
| UCS-S3260-NVM464 | Cisco UCS S3260 6.4TB NVMe SSD for M5 Node(SN 200) | 2021-05-07 | 2021-08-06 | 2021-08-06 |
| UCS-S3260-NVM48 | Cisco UCS S3260 800G NVMe SSD for M5 Node(SN 200) | 2021-04-12 | 2021-10-10 | 2022-01-09 |
| UCS-S3260-TSD38K9 | Cisco VOID | 2021-06-17 | 2021-09-16 | 2021-09-16 |
| UCS-S3260-TSD4K9 | Cisco UCS S3260 400G SED Top Load K9 | 2020-05-22 | 2020-08-21 | 2020-11-19 |
| UCS-S3260-TSD8K9 | Cisco UCS S3260 800G SED Top Load K9 | 2024-06-04 | 2024-09-03 | 2024-12-02 |
| UCS-S3348-HBAM5 | Cisco UCS S3348 Pass through Controller (IT) based on LSI | 2021-04-12 | 2021-10-10 | 2022-01-09 |
| UCS-S3348-RAIDM5 | Cisco UCS S3348 Raid Controller based on LSI | 2021-04-12 | 2021-10-10 | 2022-01-09 |
| UCS-S3X48-FAN | Cisco UCS S3X48 Chassis Fan | 2021-04-12 | 2021-10-10 | 2022-01-09 |
Select a product series to view the full model table with EOL, EOS, and EOSL dates.
No matching series found.
Cisco EOL notices normally break a product retirement into several planning dates, from the public announcement through the final support milestone. Use this page to confirm the exact part number before making refresh, support-renewal, or spare-unit decisions.
Cisco publishes the retirement notice and the affected product IDs.
The normal order window closes for the listed product or license.
Maintenance, new service attachment, and renewal dates can close before final support.
The last support date is the practical EOSL milestone for most planning work.