Cisco UCS S3260 800G SED Top Load K9
- EOL
- 2024-06-04
- EOS
- 2024-09-03
- EOSL
- 2024-12-02
Browse Cisco End-of-Life, End-of-Sale, and End-of-Service-Life records. Search a part number directly, or open a product series to compare lifecycle dates across related models.
Total Products: 32829 | Page 1466 of 1642
Use this table to check Cisco lifecycle milestones by exact part number. Open a model page for source links, replacement fields, and quote options.
Cisco UCS S3260 800G SED Top Load K9
Cisco UCS S3348 Pass through Controller (IT) based on LSI
Cisco UCS S3348 Raid Controller based on LSI
Cisco UCS S3X48 Chassis Fan
Cisco UCS SX348 M5 Heatsink
Cisco UCS 5108 Blade Svr AC Chassis, 4PS, 2 IOM
Cisco UCS BASE 5108 Blade Svr AC2 Chassis for Solution Packs
Cisco UCS BASE 5108 Blade Svr AC2 Chassis for Solution Packs
Cisco (Not a standalone SKU) B200 M3 w/2xE5-2680v2,256GB 1866 MHz
Cisco Oracle 2S Entry
Cisco Oracle 2S Performance
Cisco UCS B260 M4 SAP HANA Scale Up w/2xTBD v3, 256G mem, 900G HDD
Cisco UCS B260 M4 SAP HANA Scale Up w/2xTBD v3, 256G mem, 900G HDD
Cisco UCS B260 M4 SAP HANA Scale Up w/2xTBD v3, 256G mem, 900G HDD
Cisco Oracle 4S Performance
Cisco UCS B460 M4 SAP HANA Scale Up w/2xTBD v3, 256G mem, 900G HDD
Cisco UCS B460 M4 SAP HANA Scale Up w/2xTBD v3, 256G mem, 900G HDD
Cisco UCS B460 M4 SAP HANA Scale Up w/2xTBD v3, 256G mem, 900G HDD
Cisco (Not sold standalone) UCS 6332 1RU FI/No PSU/32 QSFP+
Cisco (Not a standalone SKU)C220 M3S w/2xE5-2650v2,256G,RAID9271CV
| Part Number | Product Name | EOL Announcement | End of Sale (EOS) | End of Service Life (EOSL) |
|---|---|---|---|---|
| UCS-S3260-TSD8K9 | Cisco UCS S3260 800G SED Top Load K9 | 2024-06-04 | 2024-09-03 | 2024-12-02 |
| UCS-S3348-HBAM5 | Cisco UCS S3348 Pass through Controller (IT) based on LSI | 2021-04-12 | 2021-10-10 | 2022-01-09 |
| UCS-S3348-RAIDM5 | Cisco UCS S3348 Raid Controller based on LSI | 2021-04-12 | 2021-10-10 | 2022-01-09 |
| UCS-S3X48-FAN | Cisco UCS S3X48 Chassis Fan | 2021-04-12 | 2021-10-10 | 2022-01-09 |
| UCS-S3X48-SNM5-HS | Cisco UCS SX348 M5 Heatsink | 2021-04-12 | 2021-10-10 | 2022-01-09 |
| UCS-SA-B-CH-101 | Cisco UCS 5108 Blade Svr AC Chassis, 4PS, 2 IOM | 2015-10-19 | 2015-11-19 | 2016-02-19 |
| UCS-SA-B-CH-201 | Cisco UCS BASE 5108 Blade Svr AC2 Chassis for Solution Packs | 2016-02-05 | 2016-03-05 | 2016-06-05 |
| UCS-SA-B-CH-202 | Cisco UCS BASE 5108 Blade Svr AC2 Chassis for Solution Packs | 2016-02-05 | 2016-03-05 | 2016-06-05 |
| UCS-SA-B200M3-101 | Cisco (Not a standalone SKU) B200 M3 w/2xE5-2680v2,256GB 1866 MHz | 2015-10-19 | 2015-11-19 | 2016-02-19 |
| UCS-SA-B200M3-OR-E | Cisco Oracle 2S Entry | 2016-07-02 | 2016-12-31 | 2021-12-31 |
| UCS-SA-B200M3-OR-P | Cisco Oracle 2S Performance | 2016-07-02 | 2016-12-31 | 2021-12-31 |
| UCS-SA-B260M42C-01 | Cisco UCS B260 M4 SAP HANA Scale Up w/2xTBD v3, 256G mem, 900G HDD | 2017-03-09 | 2017-04-10 | 2017-07-10 |
| UCS-SA-B260M42C-02 | Cisco UCS B260 M4 SAP HANA Scale Up w/2xTBD v3, 256G mem, 900G HDD | 2017-03-09 | 2017-04-10 | 2017-07-10 |
| UCS-SA-B260M42C-03 | Cisco UCS B260 M4 SAP HANA Scale Up w/2xTBD v3, 256G mem, 900G HDD | 2017-03-09 | 2017-04-10 | 2017-07-10 |
| UCS-SA-B460M4-OR-P | Cisco Oracle 4S Performance | 2017-01-27 | 2017-02-27 | 2017-05-29 |
| UCS-SA-B460M42C-01 | Cisco UCS B460 M4 SAP HANA Scale Up w/2xTBD v3, 256G mem, 900G HDD | 2017-03-09 | 2017-04-10 | 2017-07-10 |
| UCS-SA-B460M42C-02 | Cisco UCS B460 M4 SAP HANA Scale Up w/2xTBD v3, 256G mem, 900G HDD | 2017-03-09 | 2017-04-10 | 2017-07-10 |
| UCS-SA-B460M42C-03 | Cisco UCS B460 M4 SAP HANA Scale Up w/2xTBD v3, 256G mem, 900G HDD | 2017-03-09 | 2017-04-10 | 2017-07-10 |
| UCS-SA-BD-FI6332 | Cisco (Not sold standalone) UCS 6332 1RU FI/No PSU/32 QSFP+ | 2020-03-13 | 2020-06-12 | 2020-06-12 |
| UCS-SA-C220M3S-03 | Cisco (Not a standalone SKU)C220 M3S w/2xE5-2650v2,256G,RAID9271CV | 2015-10-19 | 2015-11-19 | 2016-02-19 |
Select a product series to view the full model table with EOL, EOS, and EOSL dates.
No matching series found.
Cisco EOL notices normally break a product retirement into several planning dates, from the public announcement through the final support milestone. Use this page to confirm the exact part number before making refresh, support-renewal, or spare-unit decisions.
Cisco publishes the retirement notice and the affected product IDs.
The normal order window closes for the listed product or license.
Maintenance, new service attachment, and renewal dates can close before final support.
The last support date is the practical EOSL milestone for most planning work.