Cisco UCS 785GB MLC Fusion-io ioDrive2
- EOL
- 2015-02-02
- EOS
- 2015-08-03
- EOSL
- 2020-08-31
Browse Cisco End-of-Life, End-of-Sale, and End-of-Service-Life records. Search a part number directly, or open a product series to compare lifecycle dates across related models.
Total Products: 32333 | Page 1492 of 1617
Use this table to check Cisco lifecycle milestones by exact part number. Open a model page for source links, replacement fields, and quote options.
Cisco UCS 785GB MLC Fusion-io ioDrive2
Cisco UCS Blade PCIe/NVMe Storage Mezz 3200GB Medium Endurance
Cisco UCS Blade PCIe/NVMe Storage Mezz 560GB High Endurance
Cisco 1GB flash backed write cache for LSI 2208R
Cisco UCS SP FLEXPOD MED SOLUTION PAK 2xFI, 2N5K, 2xCH, 8xB200
Cisco UCS SP FLEXPOD SMALL SOLUTION PAK 2xFI, 2N5K, 1xCH, 4xB200
Cisco UCS FLEXPOD DC S w/UCS DIR, 2xN5K, 2x6248, 1xCH, 4xB200
Cisco UCS FLEXPOD DC S w/UCS DIR, VMW, 2xN5K, 2x6248, 1xCH, 4xB200
Cisco CPU Heat Sink for UCS B200 M3 and B420 M3
Cisco CPU Heat Sink for UCS B200 M4/B420 M4 (Front)
Cisco CPU Heat Sink for UCS B200 M4/B420 M4 (Rear)
Cisco CPU Heatsink for UCS B260 M4 & B460 M4 Socket 1 (Left)
Cisco CPU Heatsink for UCS B260 M4 & B460 M4 Socket 2 (Right)
Cisco Cisco+ Hybrid Cloud - M6 Blade Bundle
Cisco UCS CNA M73KR-E Emulex
Cisco Intel Crypto Mezz Card for B-Series
Cisco UCS CNA M73KR-Q Qlogic Adapter
Cisco Pending-Cisco UCS Port Expander Card (mezz) for VIC 1340
Cisco 2.5" U.2 1.0 TB Intel P4510 NVMe High Perf. Value Endurance
Cisco 2.5" U.2 1.6TB Intel P4610 NVMe High Perf. High Endurance
| Part Number | Product Name | EOL Announcement | End of Sale (EOS) | End of Service Life (EOSL) |
|---|---|---|---|---|
| UCSB-F-FIO-785M | Cisco UCS 785GB MLC Fusion-io ioDrive2 | 2015-02-02 | 2015-08-03 | 2020-08-31 |
| UCSB-F-H-32003 | Cisco UCS Blade PCIe/NVMe Storage Mezz 3200GB Medium Endurance | 2021-11-08 | 2022-02-07 | 2022-02-07 |
| UCSB-F-H-5607 | Cisco UCS Blade PCIe/NVMe Storage Mezz 560GB High Endurance | 2021-11-08 | 2022-02-07 | 2022-02-07 |
| UCSB-FBWC-1GB | Cisco 1GB flash backed write cache for LSI 2208R | 2016-07-02 | 2016-12-31 | 2021-12-31 |
| UCSB-FPOD-B200M | Cisco UCS SP FLEXPOD MED SOLUTION PAK 2xFI, 2N5K, 2xCH, 8xB200 | 2014-10-22 | 2014-11-22 | 2015-02-22 |
| UCSB-FPOD-B200S | Cisco UCS SP FLEXPOD SMALL SOLUTION PAK 2xFI, 2N5K, 1xCH, 4xB200 | 2014-10-22 | 2014-11-22 | 2015-02-22 |
| UCSB-FPOD-B200S-UD | Cisco UCS FLEXPOD DC S w/UCS DIR, 2xN5K, 2x6248, 1xCH, 4xB200 | 2014-10-22 | 2014-11-22 | 2015-02-22 |
| UCSB-FPOD-B200S-VM | Cisco UCS FLEXPOD DC S w/UCS DIR, VMW, 2xN5K, 2x6248, 1xCH, 4xB200 | 2014-10-22 | 2014-11-22 | 2015-02-22 |
| UCSB-HS-01-EP | Cisco CPU Heat Sink for UCS B200 M3 and B420 M3 | 2016-12-19 | 2017-12-31 | 2022-12-31 |
| UCSB-HS-EP-M4-F | Cisco CPU Heat Sink for UCS B200 M4/B420 M4 (Front) | 2019-02-14 | 2020-02-14 | 2025-02-28 |
| UCSB-HS-EP-M4-R | Cisco CPU Heat Sink for UCS B200 M4/B420 M4 (Rear) | 2019-02-14 | 2020-02-14 | 2025-02-28 |
| UCSB-HS-EX-L | Cisco CPU Heatsink for UCS B260 M4 & B460 M4 Socket 1 (Left) | 2019-02-14 | 2020-02-14 | 2025-02-28 |
| UCSB-HS-EX-R | Cisco CPU Heatsink for UCS B260 M4 & B460 M4 Socket 2 (Right) | 2019-02-14 | 2020-02-14 | 2025-02-28 |
| UCSB-M6-AAS | Cisco Cisco+ Hybrid Cloud - M6 Blade Bundle | 2025-04-02 | 2025-12-31 | 2030-12-31 |
| UCSB-MEZ-ELX-03 | Cisco UCS CNA M73KR-E Emulex | 2016-07-02 | 2016-12-31 | 2021-12-31 |
| UCSB-MEZ-INT8955 | Cisco Intel Crypto Mezz Card for B-Series | 2018-05-15 | 2018-08-14 | 2023-08-31 |
| UCSB-MEZ-QLG-03 | Cisco UCS CNA M73KR-Q Qlogic Adapter | 2015-03-31 | 2015-09-29 | 2020-09-30 |
| UCSB-MLOM-PT-03 | Cisco Pending-Cisco UCS Port Expander Card (mezz) for VIC 1340 | 2015-06-16 | 2015-09-15 | 2020-09-30 |
| UCSB-NVME2H-I1000 | Cisco 2.5" U.2 1.0 TB Intel P4510 NVMe High Perf. Value Endurance | 2022-06-22 | 2022-09-21 | 2022-12-20 |
| UCSB-NVME2H-I1600 | Cisco 2.5" U.2 1.6TB Intel P4610 NVMe High Perf. High Endurance | 2022-06-22 | 2022-09-21 | 2022-12-20 |
Select a product series to view the full model table with EOL, EOS, and EOSL dates.
No matching series found.
Cisco EOL notices normally break a product retirement into several planning dates, from the public announcement through the final support milestone. Use this page to confirm the exact part number before making refresh, support-renewal, or spare-unit decisions.
Cisco publishes the retirement notice and the affected product IDs.
The normal order window closes for the listed product or license.
Maintenance, new service attachment, and renewal dates can close before final support.
The last support date is the practical EOSL milestone for most planning work.