Cisco Disti: NVIDIA P40 PCIE 250W 24GB
- EOL
- 2020-09-04
- EOS
- 2021-03-05
- EOSL
- 2021-06-05
Browse Cisco End-of-Life, End-of-Sale, and End-of-Service-Life records. Search a part number directly, or open a product series to compare lifecycle dates across related models.
Total Products: 32333 | Page 1506 of 1617
Use this table to check Cisco lifecycle milestones by exact part number. Open a model page for source links, replacement fields, and quote options.
Cisco Disti: NVIDIA P40 PCIE 250W 24GB
Cisco NVIDIA TESLA, VOLTA 100 PCIE 16GB, 250W
Cisco NVIDIA TESLA, VOLTA 100 PCIE 32GB, 250W
Cisco AMD Radeon Pro V340, 2X16GB, 300W
Cisco NVIDIA GRID K1
Cisco NVIDIA GRID K2
Cisco 8 TO 8 PIN STRAIGHT GPU PWR CABLE K1-K2 C240 NEW MB
Cisco 8 TO 8 PIN Y GPU PWR CABLE DUAL K1-K2 C240 NEW MB
Cisco GPU power cable kit with adapter cable plus 8 to 8 pin Y and
Cisco C240 GPU Upgrd Kt for NVIDIA GPU w/2PCIeRisers, brace, cbls
Cisco NVIDIA TESLA, VOLTA SXM2 32GB, 300W
Cisco 3.5-in HDD Backplane for C240 M3 LFF (services spare only)
Cisco 3.5-inch HDD Backplane for C220 M3 LFF (service spare only)
Cisco 2.5-inch HDD Backplane for C220 M3 SFF (service spare only)
Cisco 24 Drive HDD Backplane for C240 M3 (services spare only)
Cisco 2.5-in HDD Backplane for C240 M3 SFF (services spare only)
Cisco CPU HEAT SINK for UCS C260 M2 RACK SERVER
Cisco CPU Heat Sink for UCS C460 M4 Rack Server
Cisco Heat Sink for UCS C220 M3 Rack Server
Cisco Heat sink for UCS C220 M4 rack servers
| Part Number | Product Name | EOL Announcement | End of Sale (EOS) | End of Service Life (EOSL) |
|---|---|---|---|---|
| UCSC-GPU-P40-CH | Cisco Disti: NVIDIA P40 PCIE 250W 24GB | 2020-09-04 | 2021-03-05 | 2021-06-05 |
| UCSC-GPU-V100 | Cisco NVIDIA TESLA, VOLTA 100 PCIE 16GB, 250W | 2020-09-04 | 2021-03-05 | 2021-06-05 |
| UCSC-GPU-V100-32 | Cisco NVIDIA TESLA, VOLTA 100 PCIE 32GB, 250W | 2021-06-17 | 2021-09-16 | 2021-09-16 |
| UCSC-GPU-V340 | Cisco AMD Radeon Pro V340, 2X16GB, 300W | 2020-03-13 | 2020-06-12 | 2020-06-12 |
| UCSC-GPU-VGXK1 | Cisco NVIDIA GRID K1 | 2016-06-08 | 2016-12-07 | 2021-12-31 |
| UCSC-GPU-VGXK2 | Cisco NVIDIA GRID K2 | 2016-06-08 | 2016-12-07 | 2021-12-31 |
| UCSC-GPUCBL-88S | Cisco 8 TO 8 PIN STRAIGHT GPU PWR CABLE K1-K2 C240 NEW MB | 2016-12-19 | 2017-12-31 | 2022-12-31 |
| UCSC-GPUCBL-88Y | Cisco 8 TO 8 PIN Y GPU PWR CABLE DUAL K1-K2 C240 NEW MB | 2016-07-02 | 2016-12-31 | 2021-12-31 |
| UCSC-GPUCBL-KIT | Cisco GPU power cable kit with adapter cable plus 8 to 8 pin Y and | 2016-12-19 | 2017-12-31 | 2022-12-31 |
| UCSC-GPUKIT1-C240 | Cisco C240 GPU Upgrd Kt for NVIDIA GPU w/2PCIeRisers, brace, cbls | 2016-12-19 | 2017-12-31 | 2022-12-31 |
| UCSC-GPUV100SXM32 | Cisco NVIDIA TESLA, VOLTA SXM2 32GB, 300W | 2021-06-17 | 2021-09-16 | 2021-09-16 |
| UCSC-HDBP-240M3L | Cisco 3.5-in HDD Backplane for C240 M3 LFF (services spare only) | 2016-12-19 | 2017-12-31 | 2022-12-31 |
| UCSC-HDBP-C220M3L | Cisco 3.5-inch HDD Backplane for C220 M3 LFF (service spare only) | 2015-06-16 | 2015-09-15 | 2020-09-30 |
| UCSC-HDBP-C220M3S | Cisco 2.5-inch HDD Backplane for C220 M3 SFF (service spare only) | 2016-12-19 | 2017-12-31 | 2022-12-31 |
| UCSC-HDBP-C240-24 | Cisco 24 Drive HDD Backplane for C240 M3 (services spare only) | 2016-12-19 | 2017-12-31 | 2022-12-31 |
| UCSC-HDBP-C240M3S | Cisco 2.5-in HDD Backplane for C240 M3 SFF (services spare only) | 2014-06-30 | 2015-12-30 | 2016-03-30 |
| UCSC-HS-01-C260 | Cisco CPU HEAT SINK for UCS C260 M2 RACK SERVER | 2014-10-31 | 2015-05-01 | 2020-04-30 |
| UCSC-HS-01-EX | Cisco CPU Heat Sink for UCS C460 M4 Rack Server | 2019-02-14 | 2020-02-14 | 2025-02-28 |
| UCSC-HS-C220M3 | Cisco Heat Sink for UCS C220 M3 Rack Server | 2016-12-19 | 2017-12-31 | 2022-12-31 |
| UCSC-HS-C220M4 | Cisco Heat sink for UCS C220 M4 rack servers | 2019-02-14 | 2020-02-14 | 2025-02-28 |
Select a product series to view the full model table with EOL, EOS, and EOSL dates.
No matching series found.
Cisco EOL notices normally break a product retirement into several planning dates, from the public announcement through the final support milestone. Use this page to confirm the exact part number before making refresh, support-renewal, or spare-unit decisions.
Cisco publishes the retirement notice and the affected product IDs.
The normal order window closes for the listed product or license.
Maintenance, new service attachment, and renewal dates can close before final support.
The last support date is the practical EOSL milestone for most planning work.