Cisco Catalyst 9800-80 Modular SLR Wireless Controller
- EOL
- 2025-01-09
- EOS
- 2025-12-31
- EOSL
- 2030-12-31
Browse Cisco End-of-Life, End-of-Sale, and End-of-Service-Life records. Search a part number directly, or open a product series to compare lifecycle dates across related models.
Total Products: 32759 | Page 413 of 1638
Use this table to check Cisco lifecycle milestones by exact part number. Open a model page for source links, replacement fields, and quote options.
Cisco Catalyst 9800-80 Modular SLR Wireless Controller
Cisco Catalyst 9800-80 Modular SLR CA Wireless Controller
Cisco Catalyst Wireless Controller 1100W AC Power Supply
Cisco Catalyst 9800-40 750W AC Power Supply, Reverse Air
Cisco Catalyst 9800-40 750W AC Power Supply
Cisco C9800 Module Blank Cover
Cisco Catalyst Wireless Controller 950W DC Power Supply
Cisco Catalyst C9800-L-C-K9
Cisco Catalyst C9800-L-F-K9
Cisco 4XIB Cable, 7m
Cisco DC Power Cable w/Barrel Plus, 0.6 meters long for MXCAM-D
Cisco DC Power Cable w/Barrel Plus, 1.15 meters long for MXCAM-D
Cisco 4-PIN MINI DIN, 0.65 meters for MX800
Cisco 4-PIN MINI DIN, 0.3 meters for MX700
Cisco HDMI to HDMI Cable 5m
Cisco HDMI to HDMI Cable, 0.95 meters long for MX700
Cisco HDMI to HDMI Cable, 1.20 meters long for MX800
Cisco HDMI to HDMI Cable, 1.4 meters long for MX800
Cisco HDMI to HDMI Cable, 1.6 meters long for MX800
Cisco HDMI to HDMI Cable, 1.75 meters long for MX700
| Part Number | Product Name | EOL Announcement | End of Sale (EOS) | End of Service Life (EOSL) |
|---|---|---|---|---|
| C9800-80-SLR-K9 | Cisco Catalyst 9800-80 Modular SLR Wireless Controller | 2025-01-09 | 2025-12-31 | 2030-12-31 |
| C9800-80-SLRCA-K9 | Cisco Catalyst 9800-80 Modular SLR CA Wireless Controller | 2025-01-09 | 2025-12-31 | 2030-12-31 |
| C9800-AC-1100W | Cisco Catalyst Wireless Controller 1100W AC Power Supply | 2025-01-09 | 2025-12-31 | 2030-12-31 |
| C9800-AC-750W-R | Cisco Catalyst 9800-40 750W AC Power Supply, Reverse Air | 2025-01-09 | 2025-12-31 | 2030-12-31 |
| C9800-AC-750W-RED | Cisco Catalyst 9800-40 750W AC Power Supply | 2025-01-09 | 2025-12-31 | 2030-12-31 |
| C9800-BLANK | Cisco C9800 Module Blank Cover | 2025-01-09 | 2025-12-31 | 2030-12-31 |
| C9800-DC-950W | Cisco Catalyst Wireless Controller 950W DC Power Supply | 2025-01-09 | 2025-12-31 | 2030-12-31 |
| C9800-L-C-K9 | Cisco Catalyst C9800-L-C-K9 | - | - | - |
| C9800-L-F-K9 | Cisco Catalyst C9800-L-F-K9 | - | - | - |
| CAB-04X-07 | Cisco 4XIB Cable, 7m | 2020-05-05 | 2021-05-05 | 2026-05-31 |
| CAB-2DC-BRL-0-6M | Cisco DC Power Cable w/Barrel Plus, 0.6 meters long for MXCAM-D | 2018-10-01 | 2019-04-01 | 2024-03-31 |
| CAB-2DC-BRL-1-15M | Cisco DC Power Cable w/Barrel Plus, 1.15 meters long for MXCAM-D | 2018-10-01 | 2019-04-01 | 2024-03-31 |
| CAB-2DC4MIN-0-65M | Cisco 4-PIN MINI DIN, 0.65 meters for MX800 | 2018-10-01 | 2019-04-01 | 2024-03-31 |
| CAB-2DC4MINI-0-3M | Cisco 4-PIN MINI DIN, 0.3 meters for MX700 | 2018-10-01 | 2019-04-01 | 2024-03-31 |
| CAB-2HDMI-5M | Cisco HDMI to HDMI Cable 5m | 2024-07-29 | 2025-01-27 | 2030-01-31 |
| CAB-2HDMILK-0-95M | Cisco HDMI to HDMI Cable, 0.95 meters long for MX700 | 2018-10-01 | 2019-04-01 | 2024-03-31 |
| CAB-2HDMILK-1-20M | Cisco HDMI to HDMI Cable, 1.20 meters long for MX800 | 2018-10-01 | 2019-04-01 | 2024-03-31 |
| CAB-2HDMILK-1-4M | Cisco HDMI to HDMI Cable, 1.4 meters long for MX800 | 2018-10-01 | 2019-04-01 | 2024-03-31 |
| CAB-2HDMILK-1-6M | Cisco HDMI to HDMI Cable, 1.6 meters long for MX800 | 2018-10-01 | 2019-04-01 | 2024-03-31 |
| CAB-2HDMILK-1-75M | Cisco HDMI to HDMI Cable, 1.75 meters long for MX700 | 2018-10-01 | 2019-04-01 | 2024-03-31 |
Select a product series to view the full model table with EOL, EOS, and EOSL dates.
No matching series found.
Cisco EOL notices normally break a product retirement into several planning dates, from the public announcement through the final support milestone. Use this page to confirm the exact part number before making refresh, support-renewal, or spare-unit decisions.
Cisco publishes the retirement notice and the affected product IDs.
The normal order window closes for the listed product or license.
Maintenance, new service attachment, and renewal dates can close before final support.
The last support date is the practical EOSL milestone for most planning work.