Cisco StackWise 3M Stacking Cable
- EOL
- 2016-10-31
- EOS
- 2017-04-30
- EOSL
- 2022-04-30
Browse Cisco End-of-Life, End-of-Sale, and End-of-Service-Life records. Search a part number directly, or open a product series to compare lifecycle dates across related models.
Total Products: 32759 | Page 418 of 1638
Use this table to check Cisco lifecycle milestones by exact part number. Open a model page for source links, replacement fields, and quote options.
Cisco StackWise 3M Stacking Cable
Cisco StackWise 3M Non-Halogen Lead Free Stacking Cable
Cisco StackWise 50CM Stacking Cable
Cisco StackWise 50CM Non-Halogen Lead Free Stacking Cable
Cisco 3.5mm stereo cable
Cisco Bladeswitch 0.5M stack cable
Cisco Bladeswitch 1M stack cable
Cisco Bladeswitch 3M stack cable
Cisco Audio Cable Quad Camera to SX80
Cisco T1 Cable RJ45 to RJ45 Bare, Spare
Cisco T3 or E3 Cable, DIN,BNC Female connector,10 Feet
Cisco T3 or E3 Cable with DIN,BNC male connector,10 Feet
Cisco T3 or E3 Cable with DIN,DIN, Female,Female connectors,10 F
Cisco Cable, Test Point Adapter MCX Conn to F
Cisco USB A to USB B Cable, 1.15 meters long for MX700
Cisco Console Cable 7ft with USBA and USBB
Cisco V.35 Cable, DCE, Female, 10 Feet
Cisco V.35 Cable, DCE, Male, 10 Feet
Cisco V.35 Cable, DTE, Male, 10 Feet
Cisco Cable for 32 Port T1/E1 Interface Module
| Part Number | Product Name | EOL Announcement | End of Sale (EOS) | End of Service Life (EOSL) |
|---|---|---|---|---|
| CAB-STACK-3M | Cisco StackWise 3M Stacking Cable | 2016-10-31 | 2017-04-30 | 2022-04-30 |
| CAB-STACK-3M-NH | Cisco StackWise 3M Non-Halogen Lead Free Stacking Cable | 2016-10-31 | 2017-04-30 | 2022-04-30 |
| CAB-STACK-50CM | Cisco StackWise 50CM Stacking Cable | 2016-10-31 | 2017-04-30 | 2022-04-30 |
| CAB-STACK-50CM-NH | Cisco StackWise 50CM Non-Halogen Lead Free Stacking Cable | 2016-10-31 | 2017-04-30 | 2022-04-30 |
| CAB-STEREO35MM | Cisco 3.5mm stereo cable | 2017-02-01 | 2017-08-02 | 2022-08-31 |
| CAB-STK-E-0-5M | Cisco Bladeswitch 0.5M stack cable | 2020-10-31 | 2022-10-31 | 2027-10-31 |
| CAB-STK-E-1M | Cisco Bladeswitch 1M stack cable | 2020-10-31 | 2022-10-31 | 2027-10-31 |
| CAB-STK-E-3M | Cisco Bladeswitch 3M stack cable | 2020-10-31 | 2022-10-31 | 2027-10-31 |
| CAB-SX80-IPQC | Cisco Audio Cable Quad Camera to SX80 | 2019-04-30 | 2019-10-29 | 2024-10-31 |
| CAB-T1-RJ45BARE | Cisco T1 Cable RJ45 to RJ45 Bare, Spare | 2015-04-02 | 2015-10-01 | 2020-09-30 |
| CAB-T3E3-DINBNC-F | Cisco T3 or E3 Cable, DIN,BNC Female connector,10 Feet | 2022-05-06 | 2022-11-04 | 2027-11-30 |
| CAB-T3E3-DINBNC-M | Cisco T3 or E3 Cable with DIN,BNC male connector,10 Feet | 2022-05-06 | 2022-11-04 | 2027-11-30 |
| CAB-T3E3-DINDIN-F | Cisco T3 or E3 Cable with DIN,DIN, Female,Female connectors,10 F | 2022-05-06 | 2022-11-04 | 2027-11-30 |
| CAB-TSTADPT-MCX-F | Cisco Cable, Test Point Adapter MCX Conn to F | 2022-05-13 | 2022-11-11 | 2027-11-30 |
| CAB-USB-A-B-1-15M | Cisco USB A to USB B Cable, 1.15 meters long for MX700 | 2018-10-01 | 2019-04-01 | 2024-03-31 |
| CAB-USBA-USBB | Cisco Console Cable 7ft with USBA and USBB | 2020-07-31 | 2020-10-30 | 2021-01-28 |
| CAB-V35FC | Cisco V.35 Cable, DCE, Female, 10 Feet | 2018-08-10 | 2018-11-09 | 2019-02-07 |
| CAB-V35MC | Cisco V.35 Cable, DCE, Male, 10 Feet | 2018-08-10 | 2018-11-09 | 2019-02-07 |
| CAB-V35MT | Cisco V.35 Cable, DTE, Male, 10 Feet | 2019-11-08 | 2020-05-08 | 2025-05-31 |
| CABLE-32T1E1 | Cisco Cable for 32 Port T1/E1 Interface Module | 2021-05-12 | 2021-06-12 | 2026-06-30 |
Select a product series to view the full model table with EOL, EOS, and EOSL dates.
No matching series found.
Cisco EOL notices normally break a product retirement into several planning dates, from the public announcement through the final support milestone. Use this page to confirm the exact part number before making refresh, support-renewal, or spare-unit decisions.
Cisco publishes the retirement notice and the affected product IDs.
The normal order window closes for the listed product or license.
Maintenance, new service attachment, and renewal dates can close before final support.
The last support date is the practical EOSL milestone for most planning work.