Cisco (P2-XD-CH-F-ICIM) XD Chassis, F Conn, ICIM
- EOL
- 2022-05-13
- EOS
- 2022-11-11
- EOSL
- 2027-11-30
Browse Cisco End-of-Life, End-of-Sale, and End-of-Service-Life records. Search a part number directly, or open a product series to compare lifecycle dates across related models.
Total Products: 32333 | Page 50 of 1617
Use this table to check Cisco lifecycle milestones by exact part number. Open a model page for source links, replacement fields, and quote options.
Cisco (P2-XD-CH-F-ICIM) XD Chassis, F Conn, ICIM
Cisco GS7000 Fwd Config Module,3x4,Rx 1,3,4
Cisco GS7000 Fwd Config Module,3x4,Rx 1,2,4
Cisco GS7000 Rev Config Module,4x3,Tx 1,3,4
Cisco GS7000 Rev Config Module,4x3,Tx 1,2,4
Cisco ASSY, PCB, DLTX CONTROL BD 1GHZ
Cisco (P2-HD-RXR-DPON-WB-LP)D-PON WB HD Dual Rev Rx, 5-90MHz, LP
Cisco Pwr Supply 24-65VAC,24/7,5VDC Hi Load
Cisco GM Node (HO) DC Pwr Supply Kit,40-90VAC
Cisco GM-RS Node (HO) DC Pwr Supply Kit, 40-90VAC
Cisco Assy, PCB, PSU 24-65VAC, 24/7 VDC
Cisco Assy, PCB, PSU 230VAC, 24/7 VDC (Mult=4)
Cisco GS7000 EDFA, Gain Flattened Low, 17dBm, SA
Cisco GS7000 EDFA, Gain Flattened High, 17dBm, SA
Cisco GS7000 EDFA, Gain Flattened Low, 20dBm, SA
Cisco GS7000 EDFA, Gain Flattened High, 20dBm, SA
Cisco (P2-EDFA-MOD-4X21.5-SA 2-Wide)Optl Amp,4x21.5dBm,SA
Cisco GS7000 Node Hsg, Enhanced Fiber Tray
Cisco Pwr Supply, 230V 1.3Amp
Cisco GM Node,4-Port,Pwr Supply Kit
| Part Number | Product Name | EOL Announcement | End of Sale (EOS) | End of Service Life (EOSL) |
|---|---|---|---|---|
| 4023768 | Cisco (P2-XD-CH-F-ICIM) XD Chassis, F Conn, ICIM | 2022-05-13 | 2022-11-11 | 2027-11-30 |
| 4024783 | Cisco GS7000 Fwd Config Module,3x4,Rx 1,3,4 | 2019-10-16 | 2020-10-15 | 2025-10-31 |
| 4024785 | Cisco GS7000 Fwd Config Module,3x4,Rx 1,2,4 | 2019-10-16 | 2020-10-15 | 2025-10-31 |
| 4024787 | Cisco GS7000 Rev Config Module,4x3,Tx 1,3,4 | 2019-10-16 | 2020-10-15 | 2025-10-31 |
| 4024790 | Cisco GS7000 Rev Config Module,4x3,Tx 1,2,4 | 2019-10-16 | 2020-10-15 | 2025-10-31 |
| 4025293 | Cisco ASSY, PCB, DLTX CONTROL BD 1GHZ | 2014-08-29 | 2015-02-27 | 2020-02-29 |
| 4025368 | Cisco (P2-HD-RXR-DPON-WB-LP)D-PON WB HD Dual Rev Rx, 5-90MHz, LP | 2017-06-01 | 2017-11-30 | 2022-11-30 |
| 4025970 | Cisco Pwr Supply 24-65VAC,24/7,5VDC Hi Load | 2019-04-19 | 2019-10-18 | 2024-10-31 |
| 4026156 | Cisco GM Node (HO) DC Pwr Supply Kit,40-90VAC | 2019-10-16 | 2020-10-15 | 2025-10-31 |
| 4026157 | Cisco GM-RS Node (HO) DC Pwr Supply Kit, 40-90VAC | 2017-02-03 | 2017-08-04 | 2022-08-31 |
| 4026176 | Cisco Assy, PCB, PSU 24-65VAC, 24/7 VDC | 2017-04-28 | 2018-04-28 | 2023-04-30 |
| 4026178 | Cisco Assy, PCB, PSU 230VAC, 24/7 VDC (Mult=4) | 2017-04-28 | 2018-04-28 | 2023-04-30 |
| 4027010 | Cisco GS7000 EDFA, Gain Flattened Low, 17dBm, SA | 2015-09-21 | 2016-03-21 | 2021-03-31 |
| 4027011 | Cisco GS7000 EDFA, Gain Flattened High, 17dBm, SA | 2015-09-21 | 2016-03-21 | 2021-03-31 |
| 4027012 | Cisco GS7000 EDFA, Gain Flattened Low, 20dBm, SA | 2015-09-21 | 2016-03-21 | 2021-03-31 |
| 4027013 | Cisco GS7000 EDFA, Gain Flattened High, 20dBm, SA | 2015-09-21 | 2016-03-21 | 2021-03-31 |
| 4027263 | Cisco (P2-EDFA-MOD-4X21.5-SA 2-Wide)Optl Amp,4x21.5dBm,SA | 2020-12-22 | 2021-06-22 | 2026-06-30 |
| 4027378 | Cisco GS7000 Node Hsg, Enhanced Fiber Tray | 2019-04-24 | 2019-10-23 | 2024-10-31 |
| 4027390 | Cisco Pwr Supply, 230V 1.3Amp | 2017-04-28 | 2018-04-28 | 2023-04-30 |
| 4027962 | Cisco GM Node,4-Port,Pwr Supply Kit | 2019-10-16 | 2020-10-15 | 2025-10-31 |
Select a product series to view the full model table with EOL, EOS, and EOSL dates.
No matching series found.
Cisco EOL notices normally break a product retirement into several planning dates, from the public announcement through the final support milestone. Use this page to confirm the exact part number before making refresh, support-renewal, or spare-unit decisions.
Cisco publishes the retirement notice and the affected product IDs.
The normal order window closes for the listed product or license.
Maintenance, new service attachment, and renewal dates can close before final support.
The last support date is the practical EOSL milestone for most planning work.