Cisco Fan Mod CISCO7609 (2 required)/Cat6509-NEB-A (1 required)
- EOL
- 2014-10-31
- EOS
- 2015-07-31
- EOSL
- 2020-07-31
Browse Cisco End-of-Life, End-of-Sale, and End-of-Service-Life records. Search a part number directly, or open a product series to compare lifecycle dates across related models.
Total Products: 32759 | Page 650 of 1638
Use this table to check Cisco lifecycle milestones by exact part number. Open a model page for source links, replacement fields, and quote options.
Cisco Fan Mod CISCO7609 (2 required)/Cat6509-NEB-A (1 required)
Cisco Type 1 Fan Module
Cisco Catalyst 9500 Type 4 front to back cooling Fan
Cisco WAVE redundant fan 40mm
Cisco WAVE redundant fan 60mm
Cisco ASSY, F-CONN,5/8, STND
Cisco FERRITE-BEAD
Cisco Fiber Channel Option
Cisco FIPS opacity shield for Cisco 2901
Cisco FIPS opacity shield for Cisco 2911
Cisco FIPS opacity shield for Cisco 2921
Cisco FIPS opacity shield for Cisco 2951
Cisco CISCO1905 DRAM Upgrade from 256MB to 512MB
Cisco U.S. Export Restriction Compliance license for 2921/2951
Cisco SNA Feature Paper PAK for Cisco 2901-2951
Cisco U.S. Export Restriction Compliance license for 3900 series
Cisco SNA Feature Paper PAK for Cisco 3925/3945
Cisco U.S. Export Restriction Compliance license for 3900E series
Cisco Booster Performance License for 4220 Series
Cisco Performance on Demand License for 4220 Series
| Part Number | Product Name | EOL Announcement | End of Sale (EOS) | End of Service Life (EOSL) |
|---|---|---|---|---|
| FAN-MOD-09 | Cisco Fan Mod CISCO7609 (2 required)/Cat6509-NEB-A (1 required) | 2014-10-31 | 2015-07-31 | 2020-07-31 |
| FAN-T1 | Cisco Type 1 Fan Module | 2020-10-31 | 2021-10-31 | 2026-10-31 |
| FAN-T4-R | Cisco Catalyst 9500 Type 4 front to back cooling Fan | 2025-04-30 | 2026-04-30 | 2031-04-30 |
| FAN-WAVE-40MM | Cisco WAVE redundant fan 40mm | 2017-09-30 | 2018-03-31 | 2023-03-31 |
| FAN-WAVE-60MM | Cisco WAVE redundant fan 60mm | 2017-09-30 | 2018-03-31 | 2023-03-31 |
| FCONNTOR-CMC-S | Cisco ASSY, F-CONN,5/8, STND | 2018-10-31 | 2019-05-01 | 2024-04-30 |
| FERRITE-BEAD | Cisco FERRITE-BEAD | 2020-07-31 | 2020-10-30 | 2021-01-28 |
| FIBER-CHANNEL-OPT | Cisco Fiber Channel Option | 2020-09-30 | 2021-03-31 | 2026-03-31 |
| FIPS-SHIELD-2901 | Cisco FIPS opacity shield for Cisco 2901 | 2021-05-05 | 2021-11-03 | 2026-11-30 |
| FIPS-SHIELD-2911 | Cisco FIPS opacity shield for Cisco 2911 | 2021-05-05 | 2021-11-03 | 2026-11-30 |
| FIPS-SHIELD-2921 | Cisco FIPS opacity shield for Cisco 2921 | 2021-05-05 | 2021-11-03 | 2026-11-30 |
| FIPS-SHIELD-2951 | Cisco FIPS opacity shield for Cisco 2951 | 2021-05-05 | 2021-11-03 | 2026-11-30 |
| FL-1900-256U512MB | Cisco CISCO1905 DRAM Upgrade from 256MB to 512MB | 2021-05-05 | 2021-11-03 | 2026-11-30 |
| FL-29-HSEC-K9 | Cisco U.S. Export Restriction Compliance license for 2921/2951 | 2017-06-16 | 2017-09-15 | 2017-09-15 |
| FL-29-SNA | Cisco SNA Feature Paper PAK for Cisco 2901-2951 | 2021-05-05 | 2021-11-03 | 2026-11-30 |
| FL-39-HSEC-K9 | Cisco U.S. Export Restriction Compliance license for 3900 series | 2017-06-16 | 2017-09-15 | 2017-09-15 |
| FL-39-SNA | Cisco SNA Feature Paper PAK for Cisco 3925/3945 | 2021-05-05 | 2021-11-03 | 2026-11-30 |
| FL-39E-HSEC-K9 | Cisco U.S. Export Restriction Compliance license for 3900E series | 2021-05-05 | 2021-11-03 | 2026-11-30 |
| FL-4220-BOOST-K9 | Cisco Booster Performance License for 4220 Series | 2023-10-26 | 2024-01-26 | 2029-01-31 |
| FL-4220-PERF-K9 | Cisco Performance on Demand License for 4220 Series | 2022-11-07 | 2023-11-07 | 2028-11-30 |
Select a product series to view the full model table with EOL, EOS, and EOSL dates.
No matching series found.
Cisco EOL notices normally break a product retirement into several planning dates, from the public announcement through the final support milestone. Use this page to confirm the exact part number before making refresh, support-renewal, or spare-unit decisions.
Cisco publishes the retirement notice and the affected product IDs.
The normal order window closes for the listed product or license.
Maintenance, new service attachment, and renewal dates can close before final support.
The last support date is the practical EOSL milestone for most planning work.