Cisco Firepower Management Center Software v6.0.1
- EOL
- 2017-05-12
- EOS
- 2017-11-10
- EOSL
- 2020-11-30
Browse Cisco End-of-Life, End-of-Sale, and End-of-Service-Life records. Search a part number directly, or open a product series to compare lifecycle dates across related models.
Total Products: 32759 | Page 659 of 1638
Use this table to check Cisco lifecycle milestones by exact part number. Open a model page for source links, replacement fields, and quote options.
Cisco Firepower Management Center Software v6.0.1
Cisco 2.10 GHz E5-2620 v4/85W 8C/20MB Cache/DDR4 2133MHz
Cisco 8GB DDR4-2400-MHz RDIMM/PC4-19200/single rank/x4/1.2v
Cisco FMC 12Gbps SAS 1GB FBWC Cache module (Raid 0/1/5/6)
Cisco FMC 12G SAS Modular Raid Controller
Cisco FMC 32GB SD Card Module
Cisco FMC1000 Chassis Spare w/o PSU
Cisco Firepower Management Center 1000 Chassis
Cisco FMC 900GB 12GGB 10K 2.5" SAS
Cisco FMC2500 Chassis Spare w/o PSU
Cisco Firepower Management Center 2500 Chassis
Cisco FMC 600GB 12GGB 10K 2.5" SAS
Cisco FMC4500 Chassis Spare w/o PSU
Cisco Firepower Management Center 4500 Chassis
Cisco 2.40 GHz E5-2640 v4/90W 10C/25MB Cache/DDR4 2133MHz
Cisco 16GB DDR4-2400-MHz RDIMM/PC4-19200/single rank/x4/1.2v
Cisco 800GB 12Gbps SAS SSD for FMC
Cisco FirePOWER Bezel for 8000 Series
Cisco FirePOWER LCD 10G Switch - 2U
Cisco FirePOWER LCD 10G Switch - 1U
| Part Number | Product Name | EOL Announcement | End of Sale (EOS) | End of Service Life (EOSL) |
|---|---|---|---|---|
| FMC-750-6-0-1-K9 | Cisco Firepower Management Center Software v6.0.1 | 2017-05-12 | 2017-11-10 | 2020-11-30 |
| FMC-CPU-E52620E | Cisco 2.10 GHz E5-2620 v4/85W 8C/20MB Cache/DDR4 2133MHz | 2019-07-12 | 2019-07-12 | 2024-07-31 |
| FMC-MEM-8GB | Cisco 8GB DDR4-2400-MHz RDIMM/PC4-19200/single rank/x4/1.2v | 2019-07-12 | 2019-07-12 | 2024-07-31 |
| FMC-MRAID-1G | Cisco FMC 12Gbps SAS 1GB FBWC Cache module (Raid 0/1/5/6) | 2019-07-12 | 2019-07-12 | 2024-07-31 |
| FMC-MRAID12G | Cisco FMC 12G SAS Modular Raid Controller | 2019-07-12 | 2019-07-12 | 2024-07-31 |
| FMC-SD-32G-S | Cisco FMC 32GB SD Card Module | 2019-07-12 | 2019-07-12 | 2024-07-31 |
| FMC1000-CHAS-K9 | Cisco FMC1000 Chassis Spare w/o PSU | 2019-07-12 | 2019-07-12 | 2024-07-31 |
| FMC1000-K9 | Cisco Firepower Management Center 1000 Chassis | 2019-07-12 | 2019-07-12 | 2024-07-31 |
| FMC1K-HDD-900G | Cisco FMC 900GB 12GGB 10K 2.5" SAS | 2019-07-12 | 2019-07-12 | 2024-07-31 |
| FMC2500-CHAS-K9 | Cisco FMC2500 Chassis Spare w/o PSU | 2019-07-12 | 2019-07-12 | 2024-07-31 |
| FMC2500-K9 | Cisco Firepower Management Center 2500 Chassis | 2019-07-12 | 2019-07-12 | 2024-07-31 |
| FMC2K-HDD-600G | Cisco FMC 600GB 12GGB 10K 2.5" SAS | 2019-07-12 | 2019-07-12 | 2024-07-31 |
| FMC4500-CHAS-K9 | Cisco FMC4500 Chassis Spare w/o PSU | 2019-07-12 | 2019-07-12 | 2024-07-31 |
| FMC4500-K9 | Cisco Firepower Management Center 4500 Chassis | 2019-07-12 | 2019-07-12 | 2024-07-31 |
| FMC4K-CPU-E52640E | Cisco 2.40 GHz E5-2640 v4/90W 10C/25MB Cache/DDR4 2133MHz | 2019-07-12 | 2019-07-12 | 2024-07-31 |
| FMC4K-MEM-16GB | Cisco 16GB DDR4-2400-MHz RDIMM/PC4-19200/single rank/x4/1.2v | 2019-07-12 | 2019-07-12 | 2024-07-31 |
| FMC4K-SSD-800G | Cisco 800GB 12Gbps SAS SSD for FMC | 2019-07-12 | 2019-07-12 | 2024-07-31 |
| FP-8000-BEZEL | Cisco FirePOWER Bezel for 8000 Series | 2020-03-02 | 2020-08-31 | 2025-08-31 |
| FP-NMSB-10G | Cisco FirePOWER LCD 10G Switch - 2U | 2020-03-02 | 2020-08-31 | 2025-08-31 |
| FP-NMSB-1U-10G | Cisco FirePOWER LCD 10G Switch - 1U | 2020-03-02 | 2020-08-31 | 2025-08-31 |
Select a product series to view the full model table with EOL, EOS, and EOSL dates.
No matching series found.
Cisco EOL notices normally break a product retirement into several planning dates, from the public announcement through the final support milestone. Use this page to confirm the exact part number before making refresh, support-renewal, or spare-unit decisions.
Cisco publishes the retirement notice and the affected product IDs.
The normal order window closes for the listed product or license.
Maintenance, new service attachment, and renewal dates can close before final support.
The last support date is the practical EOSL milestone for most planning work.