Cisco Connected Grid 2G/3G/4G LTE GRWIC - L America/APJC
- EOL
- 2023-07-13
- EOS
- 2024-01-11
- EOSL
- 2029-01-31
Browse Cisco End-of-Life, End-of-Sale, and End-of-Service-Life records. Search a part number directly, or open a product series to compare lifecycle dates across related models.
Total Products: 32829 | Page 690 of 1642
Use this table to check Cisco lifecycle milestones by exact part number. Open a model page for source links, replacement fields, and quote options.
Cisco Connected Grid 2G/3G/4G LTE GRWIC - L America/APJC
Cisco Connected Grid 2G/3G/4G Multimode LTE GRWIC for VZW
Cisco 4-Port Serial GRWIC
Cisco 8-Port Async/Sync Serial GRWIC, EIA-232
Cisco GRWIC Blank
Cisco EtherSwitch 8x 10/100T (4 PoE) ports + 2 100/1000 SFP
Cisco EtherSwitch 4 100FX SFP ports + 2 100/1000 SFP
Cisco Connected Grid ISDN BRI S/T GRWIC
Cisco Connected Grid ISDN BRI U GRWIC
Cisco Connected Grid VDSL2 and ADSL2/ADSL2+ GRWIC - Annex A
Cisco Connected Grid VDSL2 and ADSL2/ADSL2+ GRWIC - Annex B
Cisco Connected Grid VDSL2 and ADSL2/ADSL2+ GRWIC - Annex M
Cisco GS 1GHz 8dB Directional Coupler (mult=10)
Cisco GS 1GHz 12dB Directional Coupler (mult=10)
Cisco GS Fwd Inverse EQ, 0~4dB 105 MHz (mult=10)
Cisco GS Fwd Inverse EQ, 5~9dB 105 MHz (mult=10)
Cisco GS Fwd Inverse EQ, 10~14dB 105 MHz (mult=10)
Cisco GS Fuse Kit 10A (Pkg of 25)
Cisco GS Rev Cable EQ, 0~5dB 85MHz (mult=10)
Cisco GS Rev Cable EQ, 6~10dB 85MHz (mult=10)
| Part Number | Product Name | EOL Announcement | End of Sale (EOS) | End of Service Life (EOSL) |
|---|---|---|---|---|
| GRWIC-4G-LTE-LA | Cisco Connected Grid 2G/3G/4G LTE GRWIC - L America/APJC | 2023-07-13 | 2024-01-11 | 2029-01-31 |
| GRWIC-4G-LTE-V | Cisco Connected Grid 2G/3G/4G Multimode LTE GRWIC for VZW | 2017-10-30 | 2018-01-30 | 2023-01-31 |
| GRWIC-4T | Cisco 4-Port Serial GRWIC | 2023-07-13 | 2024-01-11 | 2029-01-31 |
| GRWIC-8A-S-232 | Cisco 8-Port Async/Sync Serial GRWIC, EIA-232 | 2023-07-13 | 2024-01-11 | 2029-01-31 |
| GRWIC-BLANK | Cisco GRWIC Blank | 2024-04-08 | 2024-10-07 | 2029-10-31 |
| GRWIC-D-ES-2S-8PC | Cisco EtherSwitch 8x 10/100T (4 PoE) ports + 2 100/1000 SFP | 2023-07-13 | 2024-01-11 | 2029-01-31 |
| GRWIC-D-ES-6S | Cisco EtherSwitch 4 100FX SFP ports + 2 100/1000 SFP | 2023-07-13 | 2024-01-11 | 2029-01-31 |
| GRWIC-ISDN-1B-S-T | Cisco Connected Grid ISDN BRI S/T GRWIC | 2023-07-13 | 2024-01-11 | 2029-01-31 |
| GRWIC-ISDN-1B-U | Cisco Connected Grid ISDN BRI U GRWIC | 2023-07-13 | 2024-01-11 | 2029-01-31 |
| GRWIC-VA-DSL-A | Cisco Connected Grid VDSL2 and ADSL2/ADSL2+ GRWIC - Annex A | 2023-07-13 | 2024-01-11 | 2029-01-31 |
| GRWIC-VA-DSL-B | Cisco Connected Grid VDSL2 and ADSL2/ADSL2+ GRWIC - Annex B | 2023-07-13 | 2024-01-11 | 2029-01-31 |
| GRWIC-VA-DSL-M | Cisco Connected Grid VDSL2 and ADSL2/ADSL2+ GRWIC - Annex M | 2023-07-13 | 2024-01-11 | 2029-01-31 |
| GS-1G-DC-08 | Cisco GS 1GHz 8dB Directional Coupler (mult=10) | 2019-10-16 | 2020-10-15 | 2025-10-31 |
| GS-1G-DC-12 | Cisco GS 1GHz 12dB Directional Coupler (mult=10) | 2019-10-16 | 2020-10-15 | 2025-10-31 |
| GS-FIEQ-105-00-04 | Cisco GS Fwd Inverse EQ, 0~4dB 105 MHz (mult=10) | 2019-10-16 | 2020-10-15 | 2025-10-31 |
| GS-FIEQ-105-05-09 | Cisco GS Fwd Inverse EQ, 5~9dB 105 MHz (mult=10) | 2019-10-16 | 2020-10-15 | 2025-10-31 |
| GS-FIEQ-105-10-14 | Cisco GS Fwd Inverse EQ, 10~14dB 105 MHz (mult=10) | 2019-10-16 | 2020-10-15 | 2025-10-31 |
| GS-FUSE-KT-10A | Cisco GS Fuse Kit 10A (Pkg of 25) | 2019-10-16 | 2020-10-15 | 2025-10-31 |
| GS-REQ-85-00-05 | Cisco GS Rev Cable EQ, 0~5dB 85MHz (mult=10) | 2019-10-16 | 2020-10-15 | 2025-10-31 |
| GS-REQ-85-06-10 | Cisco GS Rev Cable EQ, 6~10dB 85MHz (mult=10) | 2019-10-16 | 2020-10-15 | 2025-10-31 |
Select a product series to view the full model table with EOL, EOS, and EOSL dates.
No matching series found.
Cisco EOL notices normally break a product retirement into several planning dates, from the public announcement through the final support milestone. Use this page to confirm the exact part number before making refresh, support-renewal, or spare-unit decisions.
Cisco publishes the retirement notice and the affected product IDs.
The normal order window closes for the listed product or license.
Maintenance, new service attachment, and renewal dates can close before final support.
The last support date is the practical EOSL milestone for most planning work.