Cisco 730 Headset, Carbon Black - SPARE (Service Unit Only)
- EOL
- 2026-05-05
- EOS
- 2026-08-02
- EOSL
- 2031-08-31
Browse Cisco End-of-Life, End-of-Sale, and End-of-Service-Life records. Search a part number directly, or open a product series to compare lifecycle dates across related models.
Total Products: 32829 | Page 705 of 1642
Use this table to check Cisco lifecycle milestones by exact part number. Open a model page for source links, replacement fields, and quote options.
Cisco 730 Headset, Carbon Black - SPARE (Service Unit Only)
Cisco 16-Port Async HWIC
Cisco 16-Port Async Temperature Tolerant HWIC
Cisco ISDN BRI NT1 HWIC 1 port
Cisco 1-Port ISDN BRI U High-Speed WAN Interface Card
Cisco 1 port channelized T1/E1 and PRI HWIC (data only)
Cisco 1-port serial WAN (Cisco 1861 only)
Cisco T1/E1 HWIC w/Intg CSU/DSU (Cisco 1861 only)
Cisco 2-Port Async/Sync Serial WAN Interface Card
Cisco 2-port serial WAN (Cisco 1861 only)
Cisco 2-pair G.SHDSL HWIC
Cisco 4-pair EFM Based HWIC
Cisco Carte HWIC série à 4 ports
Cisco HWIC T1/E1 Clear Channel à 4 ports
Cisco Antenna Options
Cisco 12G 9400-8e 12G SAS HBA for external JBOD attach
Cisco Cisco+ Hybrid Cloud - HyperFlex bundle
Cisco HX-AMD JumpStart Offer.Pre-Approval needed before quote/ord
Cisco FlexStorage 12G SAS RAID contr w/2GB FBWC/drive bays
Cisco 2.5" U.2 1.0 TB Intel P4510 NVMe High Perf. Value Endurance
| Part Number | Product Name | EOL Announcement | End of Sale (EOS) | End of Service Life (EOSL) |
|---|---|---|---|---|
| HS-WL-730-C | Cisco 730 Headset, Carbon Black - SPARE (Service Unit Only) | 2026-05-05 | 2026-08-02 | 2031-08-31 |
| HWIC-16A | Cisco 16-Port Async HWIC | 2018-08-24 | 2019-02-22 | 2024-02-29 |
| HWIC-16A-T | Cisco 16-Port Async Temperature Tolerant HWIC | 2016-04-22 | 2016-10-21 | 2021-10-31 |
| HWIC-1B-U | Cisco ISDN BRI NT1 HWIC 1 port | 2016-09-09 | 2017-12-09 | 2022-12-31 |
| HWIC-1B-U-X | Cisco 1-Port ISDN BRI U High-Speed WAN Interface Card | 2018-08-24 | 2019-02-22 | 2024-02-29 |
| HWIC-1CE1T1-PRI | Cisco 1 port channelized T1/E1 and PRI HWIC (data only) | 2018-08-24 | 2019-02-22 | 2024-02-29 |
| HWIC-1SER | Cisco 1-port serial WAN (Cisco 1861 only) | 2013-11-20 | 2014-05-21 | 2019-05-31 |
| HWIC-1T1-E1 | Cisco T1/E1 HWIC w/Intg CSU/DSU (Cisco 1861 only) | 2013-11-20 | 2014-05-21 | 2019-05-31 |
| HWIC-2A-S | Cisco 2-Port Async/Sync Serial WAN Interface Card | 2016-09-09 | 2017-12-09 | 2022-12-31 |
| HWIC-2SER | Cisco 2-port serial WAN (Cisco 1861 only) | 2013-11-20 | 2014-05-21 | 2019-05-31 |
| HWIC-2SHDSL | Cisco 2-pair G.SHDSL HWIC | 2015-10-01 | 2016-03-31 | 2021-03-31 |
| HWIC-4SHDSL-E | Cisco 4-pair EFM Based HWIC | 2017-12-21 | 2018-06-21 | 2023-06-30 |
| HWIC-4T | Cisco Carte HWIC série à 4 ports | 2016-09-09 | 2017-12-09 | 2022-12-31 |
| HWIC-4T1-E1 | Cisco HWIC T1/E1 Clear Channel à 4 ports | 2016-09-09 | 2017-12-09 | 2022-12-31 |
| HWIC-ANTENNAS | Cisco Antenna Options | 2018-08-24 | 2019-02-22 | 2024-02-29 |
| HX-9400-8E | Cisco 12G 9400-8e 12G SAS HBA for external JBOD attach | 2023-05-01 | 2023-10-30 | 2024-01-28 |
| HX-AAS | Cisco Cisco+ Hybrid Cloud - HyperFlex bundle | 2023-05-01 | 2023-10-30 | 2028-10-31 |
| HX-AMD-JUMPSTART | Cisco HX-AMD JumpStart Offer.Pre-Approval needed before quote/ord | 2023-09-12 | 2024-03-12 | 2024-06-10 |
| HX-B-MRAID12G-HE | Cisco FlexStorage 12G SAS RAID contr w/2GB FBWC/drive bays | 2023-05-01 | 2023-10-30 | 2024-01-28 |
| HX-B-NVME2H-I1000 | Cisco 2.5" U.2 1.0 TB Intel P4510 NVMe High Perf. Value Endurance | 2022-06-22 | 2022-09-21 | 2022-12-20 |
Select a product series to view the full model table with EOL, EOS, and EOSL dates.
No matching series found.
Cisco EOL notices normally break a product retirement into several planning dates, from the public announcement through the final support milestone. Use this page to confirm the exact part number before making refresh, support-renewal, or spare-unit decisions.
Cisco publishes the retirement notice and the affected product IDs.
The normal order window closes for the listed product or license.
Maintenance, new service attachment, and renewal dates can close before final support.
The last support date is the practical EOSL milestone for most planning work.