Cisco Riser 2A 3PCIe slots (x8, x16, x16) supports GPU, For T4
- EOL
- 2023-05-01
- EOS
- 2023-10-30
- EOSL
- 2024-01-28
Browse Cisco End-of-Life, End-of-Sale, and End-of-Service-Life records. Search a part number directly, or open a product series to compare lifecycle dates across related models.
Total Products: 32759 | Page 720 of 1638
Use this table to check Cisco lifecycle milestones by exact part number. Open a model page for source links, replacement fields, and quote options.
Cisco Riser 2A 3PCIe slots (x8, x16, x16) supports GPU, For T4
Cisco Riser 2B 3PCIe slot(x8,x16,x8) spprts GPU+rear NVMe, For T4
Cisco Riser 2C 3PCIe slots (3 x8) supports front+rear NVMe, For T4
Cisco VOID
Cisco Riser 2E 1x16 PCIE slot, 2x Drive slots, no microSD
Cisco VOID
Cisco 12G Modular SAS HBA (max 16 drives)
Cisco 12G Modular SAS HBA for up to 26 drives
Cisco 12G 9460-8i Raid controller with 2GB cache
Cisco 1.92T SATA 6G 2.5in SSD for C220/C240 M6
Cisco 3.84T SATA 6G 2.5in SSD for C220/C240 M6
Cisco 480G SATA 6G 2.5in SSD for C220/C240 M6
Cisco 7.68T SATA 6G 2.5in SSD for C220/C240 M6
Cisco 960G SATA 6G 2.5in SSD for C220/C240 M6
Cisco VOID
1.6TB 2.5in Enterprise performance 12G SAS SSD(3X endurance)
Cisco 1.6TB 2.5in Enterprise Performance 12G SAS SSD(3X endurance)
Cisco 1.6TB 2.5 inch Enterprise Value 6G SATA SSD
Cisco 1.6TB Enterprise performance SAS SSD (10XFWPD, SED)
Cisco 1.6TB Enterprise performance SAS SSD (10XFWPD, SED)
| Part Number | Product Name | EOL Announcement | End of Sale (EOS) | End of Service Life (EOSL) |
|---|---|---|---|---|
| HX-RIS-2A-240M5 | Cisco Riser 2A 3PCIe slots (x8, x16, x16) supports GPU, For T4 | 2023-05-01 | 2023-10-30 | 2024-01-28 |
| HX-RIS-2B-240M5 | Cisco Riser 2B 3PCIe slot(x8,x16,x8) spprts GPU+rear NVMe, For T4 | 2023-05-01 | 2023-10-30 | 2024-01-28 |
| HX-RIS-2C-240M5 | Cisco Riser 2C 3PCIe slots (3 x8) supports front+rear NVMe, For T4 | 2023-05-01 | 2023-10-30 | 2024-01-28 |
| HX-RNVME-240M5 | Cisco VOID | 2022-04-06 | 2022-07-06 | 2022-10-04 |
| HX-RS2E-240M5SD | Cisco Riser 2E 1x16 PCIE slot, 2x Drive slots, no microSD | 2023-05-01 | 2023-10-30 | 2024-01-28 |
| HX-RSAS-C240M5 | Cisco VOID | 2022-04-06 | 2022-07-06 | 2022-10-04 |
| HX-SAS-M5 | Cisco 12G Modular SAS HBA (max 16 drives) | 2023-05-01 | 2023-10-30 | 2024-01-28 |
| HX-SAS-M5HD | Cisco 12G Modular SAS HBA for up to 26 drives | 2023-05-01 | 2023-10-30 | 2024-01-28 |
| HX-SAS9460-8I | Cisco 12G 9460-8i Raid controller with 2GB cache | 2023-05-01 | 2023-10-30 | 2024-01-28 |
| HX-SD-1920G | Cisco 1.92T SATA 6G 2.5in SSD for C220/C240 M6 | 2022-10-31 | 2023-01-30 | 2028-01-31 |
| HX-SD-3840G | Cisco 3.84T SATA 6G 2.5in SSD for C220/C240 M6 | 2022-10-31 | 2023-01-30 | 2028-01-31 |
| HX-SD-480G | Cisco 480G SATA 6G 2.5in SSD for C220/C240 M6 | 2022-10-31 | 2023-01-30 | 2028-01-31 |
| HX-SD-7680G | Cisco 7.68T SATA 6G 2.5in SSD for C220/C240 M6 | 2022-10-31 | 2023-01-30 | 2028-01-31 |
| HX-SD-960G | Cisco 960G SATA 6G 2.5in SSD for C220/C240 M6 | 2022-10-31 | 2023-01-30 | 2028-01-31 |
| HX-SD120GBE1NK9 | Cisco VOID | 2021-04-12 | 2021-10-10 | 2022-01-09 |
| HX-SD16H123X-EP | 1.6TB 2.5in Enterprise performance 12G SAS SSD(3X endurance) | 2020-05-22 | 2020-08-21 | 2020-11-19 |
| HX-SD16T123X-EP | Cisco 1.6TB 2.5in Enterprise Performance 12G SAS SSD(3X endurance) | 2021-05-07 | 2021-08-06 | 2021-08-06 |
| HX-SD16T61X-EV | Cisco 1.6TB 2.5 inch Enterprise Value 6G SATA SSD | 2019-01-16 | 2019-02-14 | 2024-02-29 |
| HX-SD16TBEK9 | Cisco 1.6TB Enterprise performance SAS SSD (10XFWPD, SED) | 2021-04-20 | 2021-05-20 | 2021-08-20 |
| HX-SD16TBENK9 | Cisco 1.6TB Enterprise performance SAS SSD (10XFWPD, SED) | 2021-04-20 | 2021-05-20 | 2021-08-20 |
Select a product series to view the full model table with EOL, EOS, and EOSL dates.
No matching series found.
Cisco EOL notices normally break a product retirement into several planning dates, from the public announcement through the final support milestone. Use this page to confirm the exact part number before making refresh, support-renewal, or spare-unit decisions.
Cisco publishes the retirement notice and the affected product IDs.
The normal order window closes for the listed product or license.
Maintenance, new service attachment, and renewal dates can close before final support.
The last support date is the practical EOSL milestone for most planning work.