Cisco Dual port HBA 8G–LC
- EOL
- 2015-05-01
- EOS
- 2015-10-30
- EOSL
- 2020-10-31
Browse Cisco End-of-Life, End-of-Sale, and End-of-Service-Life records. Search a part number directly, or open a product series to compare lifecycle dates across related models.
Total Products: 32759 | Page 996 of 1638
Use this table to check Cisco lifecycle milestones by exact part number. Open a model page for source links, replacement fields, and quote options.
Cisco Dual port HBA 8G–LC
Cisco HP DL370 G6 14TB
Cisco Westmere 32G DIMM 60W
Cisco Westmere 8G DIMM 60W
Cisco RadiSys RMS–220 dual CPU dual AC power
Cisco Radisys RMS–220 Dual CPU Dual DC Power
Cisco Radisys CMS 3000 G.711/SIP Lab System
Cisco Acme Net–Net 3820 Lab System (Up to 250 Licenses)
Cisco HP DL360 G6
Cisco Realtime dB x86 CPU 2-Core License
Cisco Realtime DB CPU License for x86 based servers, per two cores
Cisco Realtime dB 4-core CPU License for Cisco UCS or Sun T2
Cisco Acme Net-Net Central EMS License (per ACME HA node)
Cisco Transition EPC from Entry Level to Standard
Cisco EPC SW, Entry Level per server - HSS, PCRF, SPr, SysAdmin DB
Cisco EPC Lab SW w/integrated HSS, PCRF, and SDB
Cisco EPC 10,000 active session block
Cisco EPC 100,000 active session block
Cisco EPC 10,000 Provisioned Subscriber Block
Cisco EPC 100,000 Provisioned Subscriber Block
| Part Number | Product Name | EOL Announcement | End of Sale (EOS) | End of Service Life (EOSL) |
|---|---|---|---|---|
| MIXS-00-CS1XHB8 | Cisco Dual port HBA 8G–LC | 2015-05-01 | 2015-10-30 | 2020-10-31 |
| MIXS-00-CS1XHP37 | Cisco HP DL370 G6 14TB | 2015-05-01 | 2015-10-30 | 2020-10-31 |
| MIXS-00-CS1XN32 | Cisco Westmere 32G DIMM 60W | 2015-05-01 | 2015-10-30 | 2020-10-31 |
| MIXS-00-CS1XN8 | Cisco Westmere 8G DIMM 60W | 2015-05-01 | 2015-10-30 | 2020-10-31 |
| MIXS-00-CS1XRM22A | Cisco RadiSys RMS–220 dual CPU dual AC power | 2015-05-01 | 2015-10-30 | 2020-10-31 |
| MIXS-00-CS1XRM22D | Cisco Radisys RMS–220 Dual CPU Dual DC Power | 2015-05-01 | 2015-10-30 | 2020-10-31 |
| MIXS-00-CS1XRS30 | Cisco Radisys CMS 3000 G.711/SIP Lab System | 2015-05-01 | 2015-10-30 | 2020-10-31 |
| MIXS-00-CS1XSAN38 | Cisco Acme Net–Net 3820 Lab System (Up to 250 Licenses) | 2015-05-01 | 2015-10-30 | 2020-10-31 |
| MIXS-00-CS1XSPS | Cisco HP DL360 G6 | 2015-05-01 | 2015-10-30 | 2020-10-31 |
| MIXS-00-DB3CP2 | Cisco Realtime dB x86 CPU 2-Core License | 2016-04-01 | 2016-09-30 | 2019-09-30 |
| MIXS-00-DB3CPU2 | Cisco Realtime DB CPU License for x86 based servers, per two cores | 2016-04-01 | 2016-09-30 | 2019-09-30 |
| MIXS-00-DB3CPU4 | Cisco Realtime dB 4-core CPU License for Cisco UCS or Sun T2 | 2016-04-01 | 2016-09-30 | 2019-09-30 |
| MIXS-00-EM1ANN | Cisco Acme Net-Net Central EMS License (per ACME HA node) | 2015-05-01 | 2015-10-30 | 2018-10-31 |
| MIXS-00-EP3E2S | Cisco Transition EPC from Entry Level to Standard | 2016-04-01 | 2016-09-30 | 2019-09-30 |
| MIXS-00-EP3K25S | Cisco EPC SW, Entry Level per server - HSS, PCRF, SPr, SysAdmin DB | 2016-04-01 | 2016-09-30 | 2019-09-30 |
| MIXS-00-EP3L25S | Cisco EPC Lab SW w/integrated HSS, PCRF, and SDB | 2016-04-01 | 2016-09-30 | 2019-09-30 |
| MIXS-00-EP3S41 | Cisco EPC 10,000 active session block | 2016-04-01 | 2016-09-30 | 2019-09-30 |
| MIXS-00-EP3S51 | Cisco EPC 100,000 active session block | 2016-04-01 | 2016-09-30 | 2019-09-30 |
| MIXS-00-EP3SB41 | Cisco EPC 10,000 Provisioned Subscriber Block | 2016-04-01 | 2016-09-30 | 2019-09-30 |
| MIXS-00-EP3SB51 | Cisco EPC 100,000 Provisioned Subscriber Block | 2016-04-01 | 2016-09-30 | 2019-09-30 |
Select a product series to view the full model table with EOL, EOS, and EOSL dates.
No matching series found.
Cisco EOL notices normally break a product retirement into several planning dates, from the public announcement through the final support milestone. Use this page to confirm the exact part number before making refresh, support-renewal, or spare-unit decisions.
Cisco publishes the retirement notice and the affected product IDs.
The normal order window closes for the listed product or license.
Maintenance, new service attachment, and renewal dates can close before final support.
The last support date is the practical EOSL milestone for most planning work.